Free concrete calculator

Concrete Calculator

Enter the size of your slab, beam, column or footing — or a known wet volume — pick the grade, and get the cement bags, sand, aggregate and water you need, with the cost from your own rates. Everything runs in your browser; nothing you type is sent or saved.

✓ Free to use ✓ No signup ✓ Browser calculation
13 bags to buy for the sample On the sample: a 4 × 3 m slab, 0.125 m thick, M20, 5% wastage — 12.71 bags exact
6 sources checked CivilSite, TheCivilStudies, Worldofcalcs, InstaCalc, InteriorCalculator and CalculatorLib — the figures this page does not reproduce are shown with the reason
Checked 15 November 2026 CivilSite, TheCivilStudies, Worldofcalcs, InstaCalc, InteriorCalculator and CalculatorLib — see the methodology at the foot of the page

Nominal-mix estimate — not a mix design. Nominal-mix estimate — not a mix design. These are site quantities from the standard nominal mixes, not an approved proportion for a particular structure. A design mix to IS 10262:2019 is needed for M25 and above and wherever the specification requires it, and the 1.54 dry-volume factor is an estimating convention, not a mix-design clause.

How much concrete do I need?

Slab, beam, column or footing — or a wet volume you already know.

In feet mode the length and width are feet and the thickness is inches.

In metres (0.05–100) or feet (0.2–330).

In metres (0.05–100) or feet (0.2–330).

A 125 mm slab is 0.125 m deep — or 5 inches in feet mode.

Measure the depth at several points — a few millimetres of extra depth over a large slab adds noticeable volume.

M20 is the minimum grade for reinforced slabs, beams and columns.

2–5% for a slab, 5–10% on rougher work, more for footings dug in soil.

The calculator runs entirely in your browser — nothing you type is sent or saved.

For a round column, work out the volume first (π × radius² × height) and use Known volume.

Indicative 2026 range: ₹380–450 per 50 kg bag.

Indicative 2026 range: ₹50–80 per cft.

Indicative 2026 range: ₹40–70 per cft.

Leave a price blank and no cost line is shown for that material.

13 BAGS TO BUY · 12.71 BAGS EXACT

13 BAGS TO BUY · 12.71 BAGS EXACT

SLAB 4 M × 3 M × 0.125 M · M20 (1:1.5:3) · 5% WASTAGE

You need 13 bags of cement (12.71 exact)

13 bags to buy · 12.71 bags exact · 1.50 m³ wet for 1.50 m³ of M20

Wet volume
1.50 m³ (53.0 cft)
Dry volume
2.43 m³ (wet × 1.54, plus 5% wastage)
Cement
12.71 bags exact (635 kg), 13 to buy
Sand
0.66 m³ (23.4 cft, 1058 kg)
Aggregate
1.32 m³ (46.7 cft, 2117 kg)
Water
318 litres (cement kg × 0.5)
Cost
Enter your rates above to price this pour — no prices entered.
Bags per m³
8.47 bags per m³

You need 13 bags of cement for 1.50 m³ of M20

Slab 4 m × 3 m × 0.125 m, M20 (1:1.5:3), 5% wastage: wet 1.50 m³ (53.0 cft), dry 2.43 m³, cement 12.71 bags exact (635 kg) — 13 to buy, sand 0.66 m³ (23.4 cft), aggregate 1.32 m³ (46.7 cft), water 318 litres.

M20 is the minimum grade for reinforced concrete slabs, beams and columns in homes under IS 456.

Wet volume 1.50 m³ (53.0 cft) = 4 m × 3 m × 0.125 m. Dry volume 2.43 m³ = wet × 1.54, plus 5% wastage.
Cement 12.71 bags exact (635 kg) → 13 to buy. Sand 0.66 m³ (23.4 cft); aggregate 1.32 m³ (46.7 cft). Water 318 litres at w/c 0.5.

Nominal mixes only — a design mix to IS 10262:2019 is needed for M25 and above and wherever the specification requires it. The 1.54 factor is an estimating convention, not a mix-design clause.

FigureQuantityNote
Wet volume1.50 m³ (53.0 cft)Length × width × depth.
Dry volume2.43 m³Wet volume × 1.54, plus 5% wastage.
Cement12.71 bags exact (635 kg)0.44 m³ at 1:1.5:3.
Bags to buy13 bagsExact count rounded up to whole 50 kg bags.
Sand0.66 m³ (23.4 cft, 1058 kg)Dry volume × sand share of the mix.
Aggregate1.32 m³ (46.7 cft, 2117 kg)Dry volume × aggregate share of the mix.
Water318 litresCement kg × 0.5 (water–cement ratio).
Bags per m³8.47 bagsBags exact ÷ wet volume.
VerdictM20 is the minimum grade for reinforced concrete slabs, beams and columns in homes under IS 456.M20 (1:1.5:3).
  • Wet volume 1.50 m³ (53.0 cft) from 4 m × 3 m × 0.125 m.
  • Dry volume 2.43 m³ — wet volume × 1.54, plus 5% wastage.
  • Cement 0.44 m³ (635 kg) — 12.71 bags of 50 kg, so buy 13 bags.
  • Sand 0.66 m³ (23.4 cft, 1058 kg); aggregate 1.32 m³ (46.7 cft, 2117 kg).
  • Water 318 litres at a water–cement ratio of 0.5 (635 kg × 0.5).
  • Nominal mixes only — a design mix to IS 10262:2019 is needed for M25 and above and wherever the specification requires it. The 1.54 factor is an estimating convention, not a mix-design clause.

Figures as of 15 November 2026.

Recent calculations

No calculations yet — work one out above.

The sample: a 4 × 3 m slab — 13 bags to buy

The sample is a 4 m × 3 m slab, 0.125 m thick, in M20 with 5% wastage — wet 1.50 m³ (53.0 cft), dry 2.43 m³, cement 12.71 bags exact (13 to buy, 635 kg), sand 0.66 m³ (23.4 cft, 1058 kg), aggregate 1.32 m³ (46.7 cft, 2117 kg), water 318 litres.

FigureQuantityNote
Wet volume 1.50 m³ (53.0 cft) Length × width × depth.
Dry volume 2.43 m³ Wet volume × 1.54, plus 5% wastage.
Cement 12.71 bags exact (635 kg) 0.44 m³ at 1:1.5:3.
Bags to buy 13 bags Exact count rounded up to whole 50 kg bags.
Sand 0.66 m³ (23.4 cft, 1058 kg) Dry volume × sand share of the mix.
Aggregate 1.32 m³ (46.7 cft, 2117 kg) Dry volume × aggregate share of the mix.
Water 318 litres Cement kg × 0.5 (water–cement ratio).
Bags per m³ 8.47 bags Bags exact ÷ wet volume.
Verdict M20 is the minimum grade for reinforced concrete slabs, beams and columns in homes under IS 456. M20 (1:1.5:3).

What does a concrete calculator do?

It turns the size of one pour into the materials you have to order. You give it the shape — slab, beam, column, footing, or a volume you already know — the length, width and thickness in metres, or feet with the thickness in inches, the grade (M5 to M25) and a wastage allowance, and it works out the wet volume, the dry volume, the cement in 50 kg bags (exact and rounded up to whole bags), the sand and the aggregate in cubic metres, cubic feet and kilograms, and the water at a water–cement ratio of 0.5. Add your own rates for cement, sand and aggregate and it prices the pour too. The arithmetic is the dry-volume method every Indian site calculator uses: wet volume × 1.54 gives the dry volume, the mix ratio splits it between cement, sand and aggregate, and one 50 kg bag of cement is 0.0347 m³. It is an estimate for ordering and budgeting, not a mix design — and where the published calculators disagree, this page prints the difference with the reason instead of silently following one of them.

From the size of one pour to the materials list, in four steps

  1. Pick the shape and the units

    Slab, beam, column or footing — or known volume if you already know the wet volume in cubic metres or cubic feet. Work in metres, or in feet with the thickness in inches, the way Indian sites measure a slab.

  2. Enter the size

    Length, width and thickness for a shape — a 125 mm slab is 0.125 m deep, or 5 inches in feet mode — or the known volume. The wet volume is simply length × width × depth, and the page shows it in both m³ and cft.

  3. Pick the grade and the wastage

    M20 (1:1.5:3) is the minimum grade for reinforced slabs, beams and columns in homes under IS 456. M15 and M10 are for plain cement concrete; M5 and M7.5 are lean mixes for blinding and bedding. Wastage defaults to 5% — add more for a footing dug in soil.

  4. Read the quantities — and add your rates for the cost

    Cement in bags exact and bags to buy, sand and aggregate in m³, cft and kg, water in litres, and the cost if you entered rates. The verdict line tells you whether the grade is right for the job — and M25 comes with a warning, because a structural M25 needs a design mix, not the 1:1:2 shortcut.

How the quantities are worked out

The method is the dry-volume rule every one of the six calculators India actually uses states, checked on 15 November 2026. Wet volume = length × width × depth (or a known wet volume). Dry volume = wet volume × 1.54, plus the wastage percentage, applied to the dry volume BEFORE the mix split — InstaCalc applies its 5% the same way, which is why its 5 × 4 × 0.15 m slab at M20 gives exactly 4.85 m³, 26 bags, 2,116.8 kg of sand and 4,233.6 kg of aggregate on this page too. The mix split is by volume: cement = dry × c ÷ (c + s + a), sand = dry × s ÷ (c + s + a), aggregate = dry × a ÷ (c + s + a), with M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4, M20 1:1.5:3 and M25 1:1:2. Cement is 1,440 kg/m³ and one 50 kg bag is 0.0347 m³, so bags = cement volume ÷ 0.0347 and cement kg = cement volume × 1,440; bags to buy is the exact count rounded up to whole bags. Sand and aggregate are 1,600 kg/m³ each — a figure InstaCalc never states but its own outputs imply (1.26 m³ × 1.05 × 1,600 = 2,116.8 kg). Water is cement kg × 0.5. One cubic metre is 35.3147 cft. Four published figures do NOT reproduce on this page and are shown with the reason: InteriorCalculator prints 286 litres of water for its 12 × 10 ft slab while this page gives 285 litres (it converts 50 cft at 35.3 cft/m³ while this page uses the exact 35.3147); CivilSite prints 1,009 kg of cement for its 5 × 4 m slab while this page gives 1,008 kg (it converts its bag count back to kg, 20.17 bags × 50 kg, while this page multiplies the cement volume by 1,440 kg/m³ directly); CalculatorLib prints 8.23 bags for a 2 m³ 1:2:4 slab while this page gives 12.68 bags (it applies the mix fraction directly to the wet volume and does NOT apply the 1.54 dry-volume factor — its own page admits this); and InstaCalc's FAQ says 'approximately 8.2 bags' for 1 m³ of M20 while its own step-by-step computes 8.06 and this page gives 8.07. CivilSite also prints 0.94 m³ of aggregate for 1 m³ of M7.5; the exact figure is 1.54 × 8/13 = 0.9477 m³, which rounds to 0.95 m³ (thecivilstudies prints 0.95) — CivilSite truncates to 2dp. InstaCalc states a 50 kg bag as '1.25 cft' while every other source says 1.23 cft (0.0347 m³ = 1.2255 cft); the model keeps 0.0347 m³.

Eleven pours, eleven quantities

Eleven worked examples from the calculators India actually uses — each one reproduced exactly by this calculator, except where a difference is stated.

The sample: a 4 × 3 m slab, 0.125 m thick, M20, 5% wastage

The sample: a 4 m × 3 m slab, 0.125 m thick, in M20 with 5% wastage. Wet volume 1.50 m³ (53.0 cft); dry volume 2.43 m³; cement 12.71 bags exact — 13 to buy — 635 kg; sand 0.66 m³ (23.4 cft, 1058 kg); aggregate 1.32 m³ (46.7 cft, 2117 kg); water 318 litres. That is 8.47 bags per m³ — the same 8.07 bags per m³ the published 1 m³ tables print, plus the 5% wastage.

Wet 1.50 m³ (53.0 cft) · dry 2.43 m³ · cement 12.71 bags exact, 13 to buy (635 kg) · sand 0.66 m³ (23.4 cft, 1058 kg) · aggregate 1.32 m³ (46.7 cft, 2117 kg) · water 318 L.

TheCivilStudies' slab, reproduced — and what 5% wastage adds

TheCivilStudies' quick site example: the same 4 × 3 m slab, 0.125 m thick, in M20 but with no wastage. It prints 1.5 m³ → 12.1 bags, and this page gives 12.10 bags exact — the same figure. Add the usual 5% wastage and it becomes 12.71 bags exact, 13 to buy: the sample above.

Wet 1.50 m³ (53.0 cft) · dry 2.31 m³ · cement 12.10 bags exact, 13 to buy (605 kg) · sand 0.63 m³ (22.2 cft, 1008 kg) · aggregate 1.26 m³ (44.5 cft, 2016 kg) · water 302 L.

TheCivilStudies' column: barely two bags

TheCivilStudies' column: 300 × 300 mm, 3 m high, in M20. The volume is 0.27 m³ and it prints 2.2 bags; this page gives 2.18 bags exact — 3 to buy. A column this small takes barely two bags, which is why site mixing a single column rarely makes sense.

Wet 0.27 m³ (9.5 cft) · dry 0.42 m³ · cement 2.18 bags exact, 3 to buy (109 kg) · sand 0.11 m³ (4.0 cft, 181 kg) · aggregate 0.23 m³ (8.0 cft, 363 kg) · water 54 L.

TheCivilStudies' footing: 0.90 m³, 7.3 bags

TheCivilStudies' footing: 1.5 × 1.5 m, 0.4 m deep, in M20. The volume is 0.90 m³ and it prints 7.3 bags; this page gives 7.26 bags exact — 8 to buy. Footings dug in soil usually need more wastage than a slab — Worldofcalcs says to add 2–5% and more for footings.

Wet 0.90 m³ (31.8 cft) · dry 1.39 m³ · cement 7.26 bags exact, 8 to buy (363 kg) · sand 0.38 m³ (13.3 cft, 605 kg) · aggregate 0.76 m³ (26.7 cft, 1210 kg) · water 181 L.

Worldofcalcs' 20 × 15 ft slab, reproduced exactly

Worldofcalcs' worked example: a 20 × 15 ft slab, 5 inches thick, in M20. Volume 125.0 cft (3.54 m³); dry volume 5.45 m³; cement 28.56 bags exact — 29 to buy; sand 52.5 cft; aggregate 105.0 cft; water 714 litres. Every figure reproduces exactly, including the 28.56 bags and the 714 litres.

Wet 3.54 m³ (125.0 cft) · dry 5.45 m³ · cement 28.56 bags exact, 29 to buy (1427 kg) · sand 1.49 m³ (52.5 cft, 2379 kg) · aggregate 2.97 m³ (105.0 cft, 4757 kg) · water 714 L.

InstaCalc's 5 × 4 m slab with 5% wastage, reproduced exactly

InstaCalc's worked example: a 5 × 4 m slab, 0.15 m thick, in M20 with 5% wastage. It prints a required (dry + wastage) volume of 4.85 m³, 26 bags, sand 2,116.8 kg and aggregate 4,233.6 kg; this page gives dry 4.85 m³, 26 bags to buy, sand 2117 kg and aggregate 4234 kg — every figure reproduces exactly. InstaCalc's own FAQ says 'approximately 8.2 bags' for 1 m³ of M20 while its step-by-step computes 8.06; this page gives 8.07, and the difference is stated on the page.

Wet 3.00 m³ (105.9 cft) · dry 4.85 m³ · cement 25.42 bags exact, 26 to buy (1270 kg) · sand 1.32 m³ (46.7 cft, 2117 kg) · aggregate 2.65 m³ (93.4 cft, 4234 kg) · water 635 L.

InteriorCalculator's 12 × 10 ft slab — and the 1-litre water difference

InteriorCalculator's worked example: a 12 × 10 ft slab, 5 inches thick, in M20. It prints 50 cft (1.42 m³), dry 2.18 m³, 11.4 bags, sand 21 cft (0.59 m³) and aggregate 42 cft (1.19 m³); this page gives 11.42 bags exact, sand 21.0 cft and aggregate 42.0 cft — every figure reproduces. One figure does NOT reproduce: it prints 286 litres of water while this page gives 285 litres. The reason is stated on the page — it converts 50 cft at 35.3 cft/m³ while this page uses the exact 35.3147.

Wet 1.42 m³ (50.0 cft) · dry 2.18 m³ · cement 11.42 bags exact, 12 to buy (571 kg) · sand 0.59 m³ (21.0 cft, 951 kg) · aggregate 1.19 m³ (42.0 cft, 1903 kg) · water 285 L.

CivilSite's 5 × 4 m slab — and the 1-kg cement difference

CivilSite's worked example: a 5 × 4 m slab, 125 mm thick, in M20. It prints 20.2 bags exact (21 to buy), sand 1.05 m³ / 37.1 cft, aggregate 2.10 m³ / 74.2 cft and 504 litres of water; this page gives 20.17 bags exact, 21 to buy, and 504 litres — every figure reproduces. One figure does NOT reproduce: it prints 1,009 kg of cement while this page gives 1008 kg. The reason is stated on the page — it converts its bag count back to kg (20.17 bags × 50 kg) while this page multiplies the cement volume by 1,440 kg/m³ directly.

Wet 2.50 m³ (88.3 cft) · dry 3.85 m³ · cement 20.17 bags exact, 21 to buy (1008 kg) · sand 1.05 m³ (37.1 cft, 1680 kg) · aggregate 2.10 m³ (74.2 cft, 3360 kg) · water 504 L.

One cubic metre of M15: 6.34 bags

One cubic metre of M15 (1:2:4), no wastage. The published 1 m³ tables print 6.3 bags, 317 kg, 0.44 m³ of sand and 0.88 m³ of aggregate; this page gives 6.34 bags exact (317 kg), sand 0.44 m³ (15.5 cft) and aggregate 0.88 m³ (31.1 cft). M15 is for plain cement concrete and non-structural work — not for reinforced slabs, beams or columns.

Wet 1.00 m³ (35.3 cft) · dry 1.54 m³ · cement 6.34 bags exact, 7 to buy (317 kg) · sand 0.44 m³ (15.5 cft, 704 kg) · aggregate 0.88 m³ (31.1 cft, 1408 kg) · water 158 L.

One cubic metre of M25: 11.10 bags — nominal only, use a design mix

One cubic metre of M25 (1:1:2), no wastage. The published tables print 11.1 bags and 554 kg; this page gives 11.10 bags exact (554 kg), sand 0.39 m³ and aggregate 0.77 m³. But do not order on that figure: IS 456 allows nominal mixes only up to M20, and a real M25 design mix usually needs only about 7–8 bags per m³ — the 1:1:2 figure is shown for reference only.

Wet 1.00 m³ (35.3 cft) · dry 1.54 m³ · cement 11.10 bags exact, 12 to buy (554 kg) · sand 0.39 m³ (13.6 cft, 616 kg) · aggregate 0.77 m³ (27.2 cft, 1232 kg) · water 277 L.

CalculatorLib's 8.23 bags — the missing 1.54 factor

CalculatorLib's worked example: a 5 × 4 m slab, 0.1 m thick, in 1:2:4. It prints 8.23 bags; this page gives 12.68 bags — 54.1% more. The difference is stated on the page, not hidden: CalculatorLib applies the mix fraction directly to the wet volume and does NOT apply the 1.54 dry-volume factor — its own page admits this ('it understates cement for a true wet volume. Multiply the result by about 1.54 to correct for this'). Its quick example DOES reproduce: a 4 × 3 × 0.1 m slab at 1:2:4 with 10% wastage gives 8.4 bags, 9 to buy.

Wet 2.00 m³ (70.6 cft) · dry 3.08 m³ · cement 12.68 bags exact, 13 to buy (634 kg) · sand 0.88 m³ (31.1 cft, 1408 kg) · aggregate 1.76 m³ (62.2 cft, 2816 kg) · water 317 L.

IS 456 limits: how much cement, how much water, which grade

The limits from IS 456:2000 Table 5 (for 20 mm aggregate), as printed by thecivilstudies. They decide the grade and the water, not the calculator — and they are why M25 cannot be ordered as a 1:1:2 nominal mix.

ExposureMinimum cement · max w/c · min gradeSourceNote
Mild Min cement 300 kg/m³ · max w/c 0.55 · min grade M20 IS 456:2000 Table 5 The mildest exposure — inside a building, dry and sheltered.
Moderate Min cement 300 kg/m³ · max w/c 0.50 · min grade M25 IS 456:2000 Table 5 Sheltered from severe rain or continuous wetting — most ordinary homes sit here or in Mild.
Severe Min cement 320 kg/m³ · max w/c 0.45 · min grade M30 IS 456:2000 Table 5 Severe rain, alternate wetting and drying, or coastal air within a few kilometres of the sea.
Very severe Min cement 340 kg/m³ · max w/c 0.45 · min grade M35 IS 456:2000 Table 5 Seawater spray, corrosive fumes, or alternate wetting and drying in a coastal climate.
Extreme Min cement 360 kg/m³ · max w/c 0.40 · min grade M40 IS 456:2000 Table 5 Tidal zones, direct seawater contact, or aggressive industrial chemicals.
Maximum cement content 450 kg/m³ — no more, whatever the exposure IS 456 cl. 8.2.4.2 Cement content should not exceed 450 kg/m³. More cement means more heat and shrinkage cracking, not more strength — which is why a real M25 design mix uses only about 340–400 kg/m³.

Every figure on the sample, and how it is worked out

Each figure on the sample — a 4 m × 3 m slab, 0.125 m thick, in M20 with 5% wastage — with the rule behind it. The step that surprises people is the dry volume: it is 54% bigger than the wet volume before wastage is even added, because dry cement, sand and aggregate contain air voids that fill up when water is added.

FigureHow it is worked outTypicalOn the sample
Wet volume Length × width × depth (or a known wet volume); in feet mode, length and width are feet and depth is inches A 4 × 3 m slab at 125 mm is 1.50 m³ 4 m × 3 m × 0.125 m = 1.50 m³ (53.0 cft)
Dry volume Wet volume × 1.54, plus the wastage percentage — applied before the mix split Dry volume is always bigger than wet — about 54% bigger before wastage 1.50 × 1.54 × 1.05 = 2.43 m³
Cement Dry volume × cement share of the mix ÷ 0.0347 m³ per 50 kg bag M20 needs about 8.07 bags per m³ before wastage 2.43 × 1/5.5 ÷ 0.0347 = 12.71 bags exact, 13 to buy (635 kg)
Sand Dry volume × sand share of the mix M20 needs about 0.42 m³ of sand per m³ 2.43 × 1.5/5.5 = 0.66 m³ (23.4 cft, 1058 kg)
Aggregate Dry volume × aggregate share of the mix M20 needs about 0.84 m³ of aggregate per m³ 2.43 × 3/5.5 = 1.32 m³ (46.7 cft, 2117 kg)
Water Cement kg × 0.5 (water–cement ratio) About 25 litres per 50 kg bag; never add water to gain workability 635 kg × 0.5 = 318 litres
Bags to buy Round the exact bag count UP to whole bags, after wastage Always round up — a part bag cannot be bought 12.71 bags exact → 13 bags to buy

The rules behind the answer

Seven rules, each one checkable against the sources. Nothing here is a guess — and where the sources disagree, the page says so.

Wet volume × 1.54 gives the dry volume — a convention, not an IS 456 clause

Dry cement, sand and aggregate contain air voids — typically 30% to 35% in sand and 40% to 45% in gravel (InstaCalc) — so about 1.54 m³ of dry material makes 1 m³ of wet concrete. TheCivilStudies notes some textbooks use 1.52 to 1.57. CivilSite is explicit: the 1.54 factor is 'a conventional estimating allowance' and 'not a clause that designs concrete, a universal measured yield, or proof that the selected materials will produce the required strength'. Real yield changes with aggregate grading, particle shape, moisture, entrained air, compaction and admixture. On the sample, 1.50 m³ wet × 1.54 × 1.05 wastage = 2.43 m³ dry.

The mix split is by volume: cement : sand : aggregate

The six nominal mixes are unanimous across all six sources: M5 1:5:10 (16 parts), M7.5 1:4:8 (13), M10 1:3:6 (10), M15 1:2:4 (7), M20 1:1.5:3 (5.5) and M25 1:1:2 (4). Each material takes its share of the dry volume — for M20, cement is 1/5.5, sand 1.5/5.5 and aggregate 3/5.5 of it. On the sample that is 2.43 × 1/5.5 = 0.44 m³ of cement, 0.66 m³ of sand and 1.32 m³ of aggregate. The 1 m³ tables agree: M20 needs 8.07 bags, 0.42 m³ of sand and 0.84 m³ of aggregate (thecivilstudies, worldofcalcs, civilsite), and M25 needs 11.10 bags, 0.39 m³ of sand and 0.77 m³ of aggregate (thecivilstudies, worldofcalcs).

One 50 kg bag of cement is 0.0347 m³ (1.23 cft)

At a bulk density of 1,440 kg/m³, a 50 kg bag occupies 50 ÷ 1,440 = 0.0347 m³, which is 1.23 cft (0.0347 × 35.31 = 1.2255). Every source agrees except InstaCalc, which states '1.25 cft' — a rounding difference; the model keeps 0.0347 m³. Bags = cement volume ÷ 0.0347, and cement kg = cement volume × 1,440. The two routes differ by the rounding of 0.0347: CivilSite prints 1,009 kg for its 5 × 4 m slab by converting its bag count back (20.17 bags × 50 kg), while this page multiplies the cement volume by 1,440 directly and gives 1,008 kg. Buy whole bags: 12.71 bags exact means 13 to buy, and the extra 0.29 bag is pack rounding, not extra cement in the mix.

Sand and aggregate are 1,600 kg/m³ each — and a brass is 100 cft

No source states the sand and aggregate densities outright, but InstaCalc's own outputs pin them down: its 5 × 4 × 0.15 m slab at M20 with 5% wastage prints sand 2,116.8 kg and aggregate 4,233.6 kg, which is exactly 1.26 m³ × 1.05 × 1,600 and 2.52 m³ × 1.05 × 1,600. This page uses 1,600 kg/m³ for both. In Indian site units, 1 brass = 100 cft = 2.8317 m³ (InstaCalc), so the sample's 23.4 cft of sand is 0.23 brass and a standard 10-wheel tipper carrying 10 m³ of sand is delivering about 3.53 brass.

Water is cement kg × 0.5 — and too much water weakens concrete

Keep the water–cement ratio around 0.45–0.5 (worldofcalcs, InstaCalc: 'roughly 23 to 25 litres of water per 50 kg cement bag'). Adding water to gain workability dilutes compressive strength, creates shrinkage cracks and causes honeycombing. On the sample, 635 kg × 0.5 = 318 litres. Cure the concrete with water for at least 7 days (10 or more in hot weather): it reaches about 65% of its design strength at 7 days, 90% at 14 days and full strength at 28 days (InstaCalc, worldofcalcs). One figure does NOT reproduce: InteriorCalculator prints 286 litres for its 12 × 10 ft slab while this page gives 285 — it converts 50 cft at 35.3 cft/m³ while this page uses the exact 35.3147.

Add 2–5% for wastage — 5–10% on rougher work

Worldofcalcs and thecivilstudies say 2–5% for wastage and uneven ground, more for footings dug in soil; InstaCalc's calculator defaults to 5% and its text says 5–10%; CalculatorLib says 5–10% for spillage, uneven ground and over-excavation. This page defaults to 5% and accepts 0–20%, applied to the dry volume before the mix split — which is what makes InstaCalc's worked example reproduce exactly (3 m³ wet × 1.54 = 4.62, × 1.05 = 4.85 m³ required, 26 bags). CivilSite gives no fixed percentage: procurement still needs pour geometry, construction joints, waste and return policy, batching method and aggregate moisture.

M25 nominal 1:1:2 is for reference only — IS 456 allows nominal mixes only up to M20

CivilSite refuses to print a 1:1:2 row at all ('There is deliberately no M25 ratio: design-mix grades require an approved proportion, not a site shortcut') and warns 'Do not use 1:1:2 as a universal M25 specification'. TheCivilStudies prints the 1:1:2 row (11.1 bags, 554 kg per m³) but flags it: 'IS 456 allows nominal mixes only up to M20. M25 and above should be a design mix, which normally uses far less cement than 1:1:2' — a design mix uses graded aggregates, the correct water content and usually a plasticiser, so an M25 mix commonly needs only about 340–400 kg of cement per m³ (about 7–8 bags), not the 554 kg that 1:1:2 gives. Too much cement increases cost, heat and shrinkage cracking. IS 456:2000 cl. 9.1.1 and Table 9; IS 10262:2019. This page shows the M25 nominal figures for reference and carries the warning on every M25 result.

Common concrete calculator mistakes to avoid

FACTOR
Skipping the 1.54 factor — CalculatorLib applies the mix fraction directly to the wet volume and prints 8.23 bags for a 5 × 4 × 0.1 m slab at 1:2:4 — the true figure with the 1.54 factor is 12.68 bags, 54.1% more. Its own page admits the tool 'understates cement for a true wet volume. Multiply the result by about 1.54 to correct for this.' If a calculator gives you far fewer bags than 8 per m³ of M20, check whether it applied the factor.
M25
Using M25 1:1:2 as a design mix — IS 456 allows nominal mixes only up to M20. A structural M25 needs a design mix to IS 10262:2019 based on actual materials and trials — the 1:1:2 shortcut gives 554 kg of cement per m³ where a design mix usually needs only about 340–400 kg. Ordering on 1:1:2 wastes cement and risks heat and shrinkage cracking.
WATER
Adding too much water to make the mix workable — Water beyond a 0.5 water–cement ratio weakens the concrete, creates shrinkage cracks and causes honeycombing. If the mix is stiff, fix the grading or use a plasticiser — do not add water. About 25 litres per 50 kg bag is the ceiling, not a target.
BAGS
Ordering the exact bag count with no wastage and no rounding up — 12.71 bags exact is not an order for 12.71 bags — it is 13 bags, plus wastage for spillage, uneven ground and over-excavation. Order the rounded-up count with the wastage already in it, and confirm the full pour schedule, stock, delivery staging and returns before ordering.
UNITS
Mixing up cft and m³ — 1 m³ is 35.31 cft, not 35.3 — the small difference is what makes InteriorCalculator print 286 litres of water where this page gives 285. And in feet mode the depth is inches, not feet: a 5-inch slab is 5, not 5/12, in the depth box. A 5 ft depth entry would be a 60-inch slab.

Before you trust the result

  • Is the shape right — slab, beam, column, footing, or a known volume?
  • Are the dimensions in the right units — metres, or feet with the depth in inches?
  • Is the depth the finished thickness — 0.125 m (or 5 in) for a 125 mm slab?
  • Is the grade the one on the drawings — M20 minimum for reinforced slabs, beams and columns?
  • Is the wastage enough — 5% for a slab, more for a footing dug in soil?
  • Did you round the bags UP — 12.71 bags exact means 13 to buy?
  • Is the water at a water–cement ratio of 0.5 — and are you curing for 7 to 14 days?
  • If the grade is M25, is there an approved design mix — not just the 1:1:2 shortcut?
  • Are the rates today's local rates — or the indicative 2026 ranges (cement ₹380–450/bag, sand ₹50–80/cft, aggregate ₹40–70/cft)?
  • Do you remember steel, formwork, labour and curing are extra — and that sand bulking and moisture are not modelled here?

Concrete calculator FAQs

How many cement bags are in 1 m³ of M20 concrete?
About 8 bags (8.07 exact, 403 kg) for a nominal 1:1.5:3 mix using the dry-volume factor of 1.54 — with 0.42 m³ (14.8 cft) of sand and 0.84 m³ (29.7 cft) of aggregate. TheCivilStudies, Worldofcalcs and CivilSite all print 8.1 bags; InstaCalc's step-by-step computes 8.06 and this page gives 8.07.
What is the 1.54 dry volume factor?
Dry cement, sand and aggregate contain air voids — typically 30% to 35% in sand and 40% to 45% in gravel — so about 1.54 m³ of dry material makes 1 m³ of wet concrete. It is a conventional estimating allowance, not an IS 456 clause: real yield changes with aggregate grading, moisture, compaction and admixture. Some textbooks use 1.52 to 1.57.
What are the mix ratios for M15 and M10, and what are they used for?
M15 is 1:2:4 (cement : sand : aggregate) and M10 is 1:3:6. M15 is used for plain cement concrete, foundation beds and light work; M10 for light-duty bases, paths and mass footings. Per cubic metre, M15 needs 6.34 bags, 0.44 m³ of sand and 0.88 m³ of aggregate; M10 needs 4.44 bags, 0.46 m³ of sand and 0.92 m³ of aggregate. Neither is for reinforced slabs, beams or columns — M20 is the minimum there.
How much water does concrete need?
At a water–cement ratio of 0.5, half the cement weight: 318 litres for the sample's 635 kg of cement, or about 25 litres per 50 kg bag. Keep the ratio between 0.45 and 0.50. More water weakens the concrete — and cure it with water for at least 7 days (10 or more in hot weather).
How thick should a residential slab be?
Typically 100 mm to 125 mm (4 to 5 inches) thick (InstaCalc); Worldofcalcs says residential roof slabs are commonly 4.5 to 6 inches (115–150 mm). It depends on the span and the load — follow your structural engineer's drawings, not a rule of thumb.
Is site mix or ready-mix cheaper?
Ready-mix (RMC) costs about ₹5,000–6,500 per m³ for M20 in 2026, delivered, pump extra (InteriorCalculator — indicative). Site mix can be cheaper for small quantities, but RMC gives consistent strength and saves labour and time, especially for slabs. Above roughly 3–5 m³, ready-mix is usually quicker and more consistent.
What is a brass of sand?
1 brass = 100 cubic feet (cft) = 2.8317 m³. Bulk sand, aggregate and rubble are sold by the brass across Maharashtra, Gujarat, Karnataka and Madhya Pradesh. A standard 10-wheel tipper carrying 10 m³ of sand is delivering approximately 3.53 brass.
How much wastage should I add?
2–5% for a slab on even ground (Worldofcalcs, thecivilstudies), 5–10% on rougher work (InstaCalc, CalculatorLib), and more for footings dug in soil. This page defaults to 5% and applies it to the dry volume before the mix split. Spillage, uneven ground, pump-line residue and formwork deflection all eat into the order.
Is M25 concrete 1:1:2?
Only as a nominal reference — do not use 1:1:2 as a universal M25 specification. IS 456 allows nominal mixes only up to M20; M25 design-mix concrete needs an approved proportion based on actual materials and trials (IS 10262:2019), which usually needs only about 7–8 bags per m³, not the 11.1 bags that 1:1:2 gives.
How do I convert cft to m³?
Divide by 35.31 (or multiply by 0.02832). So 125 cft of concrete is about 3.54 m³, and 50 cft is about 1.42 m³. In the other direction, multiply m³ by 35.31: 1.50 m³ is 53.0 cft.

Methodology and honest limits

The arithmetic on this page was checked against the six concrete calculators people actually use, on 15 November 2026. All six were fetched in full: CivilSite's Cement Bags per m³ Concrete (worked example: slab 5 m × 4 m × 125 mm, M20 — 20.2 bags exact, 21 to buy, cement 1,009 kg, sand 1.05 m³ / 37 cft, aggregate 2.10 m³ / 74 cft, water 504 litres; its 1 m³ table prints M5 2.8 bags / 0.48 m³ sand / 0.96 m³ aggregate, M7.5 3.4 / 0.47 / 0.94, M10 4.4 / 0.46 / 0.92, M15 6.3 / 0.44 / 0.88 and M20 8.1 / 0.42 / 0.84 — the M7.5 aggregate figure does NOT reproduce: the exact figure is 1.54 × 8/13 = 0.9477 m³, which rounds to 0.95 m³, and CivilSite truncates to 0.94; the cement kg figure does NOT reproduce either: it prints 1,009 kg while this page gives 1,008 kg, because it converts its bag count back to kg while this page multiplies the cement volume by 1,440 kg/m³ directly; it deliberately prints no M25 row); TheCivilStudies' Cement Bags in 1 m³ of Concrete (1 m³ table for all six grades — M5 2.8 bags / 139 kg / 0.48 / 0.96, M7.5 3.4 / 171 / 0.47 / 0.95, M10 4.4 / 222 / 0.46 / 0.92, M15 6.3 / 317 / 0.44 / 0.88, M20 8.1 / 403 / 0.42 / 0.84, M25 11.1 / 554 / 0.39 / 0.77 — every figure reproduces within the printed precision; quick site examples at 8.06 bags per m³ before wastage — slab 1.5 m³ → 12.1 bags, column 0.27 m³ → 2.2 bags, beam 0.35 m³ → 2.8 bags, footing 0.90 m³ → 7.3 bags — all reproduce; IS 456:2000 Table 5 and cl. 8.2.4.2, and IS 10262:2019, cited); Worldofcalcs' Concrete Calculator (worked example: 20 × 15 ft slab, 5 in thick, M20 — 125 cft / 3.54 m³, dry 5.45 m³, 28.56 bags exact, 29 to buy, sand 52.5 cft, aggregate 105 cft, water 714 litres — every figure reproduces; 1 m³ table — M10 4.44 bags / 16.3 cft sand / 32.6 cft aggregate, M15 6.34 / 15.5 / 31.1, M20 8.07 / 14.8 / 29.7, M25 11.10 / 13.6 / 27.2 — every figure reproduces within the printed precision); InstaCalc's Concrete & Building Material Estimator (worked example: 5 × 4 m × 0.15 m slab, M20, 5% wastage — required volume 4.85 m³, 26 bags, sand 2,116.8 kg, aggregate 4,233.6 kg — every figure reproduces; its FAQ figure does NOT reproduce: it says 'approximately 8.2 bags' for 1 m³ of M20 while its own step-by-step computes 8.06 and this page gives 8.07; it also states a 50 kg bag as '1.25 cft' while every other source says 1.23 cft — a rounding difference, and the model keeps 0.0347 m³); InteriorCalculator's Concrete Calculator (worked example: 12 × 10 ft slab, 5 in thick, M20 — 50 cft / 1.42 m³, dry 2.18 m³, 11.4 bags, sand 21 cft / 0.59 m³, aggregate 42 cft / 1.19 m³ — every figure reproduces; the water figure does NOT reproduce: it prints 286 litres while this page gives 285 litres, because it converts 50 cft at 35.3 cft/m³ while this page uses the exact 35.3147; its 2026 India price ranges are cement ₹380–450/bag, sand ₹50–80/cft, aggregate ₹40–70/cft, and ready-mix M20 ₹5,000–6,500/m³ — all clearly labelled indicative); and CalculatorLib's Cement Calculator (worked example: 5 m × 4 m × 0.1 m slab, 1:2:4 — 8.23 bags — does NOT reproduce: this page gives 12.68 bags, 54.1% more, because CalculatorLib applies the mix fraction directly to the wet volume and does NOT apply the 1.54 dry-volume factor, which its own page admits; its quick example DOES reproduce: a 4 × 3 × 0.1 m slab at 1:2:4 with 10% wastage gives 8.4 bags, 9 to buy). The dry-volume factor, the mix ratios and the bag volume are unanimous across all six sources. The sand and aggregate densities (1,600 kg/m³ each) are inferred from InstaCalc's own outputs, as stated above — no other source gives them. This is a nominal-mix estimate, not a mix design: the 1.54 factor is an estimating convention, not a mix-design clause; sand bulking and moisture are not modelled (guessing a bulking percentage from an internet table is not a field measurement); steel, formwork, labour and curing are extra; prices are user-entered, or the clearly-labelled indicative 2026 ranges above, never market fact. For related tools, the Home Loan EMI Calculator works out the monthly cost of a home loan for the build, the EMI Calculator works out any loan's monthly payment, and the Income Tax Calculator works out your income tax. Last updated 15 November 2026.

Plan around the answer — the pour, your budget and the rest

Try different figures or a different grade — or run the same check with the related tools for your other plans.

WAM to GPA CalculatorGPA to WAM CalculatorSSC Age CalculatorCGPA to Percentage CalculatorAge CalculatorUPSC Age CalculatorIBPS Age CalculatorRRB Age CalculatorEMI CalculatorSIP CalculatorBMI CalculatorPercentage CalculatorGST CalculatorPPF CalculatorFD CalculatorIncome Tax CalculatorRD CalculatorHome Loan EMI CalculatorGratuity CalculatorHRA CalculatorCompound Interest CalculatorEPF CalculatorNPS CalculatorSSY CalculatorNSC CalculatorSCSS CalculatorPost Office MIS CalculatorKVP CalculatorPersonal Loan EMI CalculatorPost Office Time Deposit CalculatorCar Loan EMI CalculatorAPY CalculatorSWP CalculatorWashing Machine Capacity CalculatorMattress Size FinderLaptop Budget CheckerEvent Planning Budget EstimatorRetirement CalculatorStep-up SIP CalculatorHome Loan Eligibility CalculatorLumpsum CalculatorEducation Loan EMI CalculatorBike Loan EMI CalculatorGold Loan CalculatorCredit Card EMI CalculatorSalary CalculatorSimple Interest CalculatorCAGR CalculatorBMR CalculatorBody Fat CalculatorXIRR CalculatorTDS CalculatorRent vs Buy CalculatorPregnancy Due Date CalculatorOvulation Calculator — Fertile Window & Ovulation Date (India)Discount Calculator — Sale Price, Savings & GST (India)Date Calculator — Days Between Dates, Add Days & Countdown (India)Inflation Calculator — Future Cost, Value Today & CII (India)Stamp Duty Calculator — Property Registration Cost (India)Capital Gains Tax Calculator (India) — LTCG & STCG TaxFuel Cost Calculator (India)Share Average Calculator (India)Advance Tax Calculator (India)Brokerage Calculator (India)Leave Encashment Calculator (India)Rooftop Solar Calculator (India)Home Loan Prepayment Calculator (India)DA Calculator (India)Child Education Calculator (India)Sleep Calculator (India)Home Loan Tax Benefit CalculatorGold Price CalculatorAttendance CalculatorEmergency Fund CalculatorSilver Price CalculatorAC Tonnage CalculatorHouse Construction Cost CalculatorElectricity Bill CalculatorPaint CalculatorTerm Insurance CalculatorHealth Insurance Premium CalculatorTiles CalculatorCar Insurance Premium CalculatorTwo-Wheeler Insurance Premium CalculatorPeriod CalculatorProtein CalculatorBrick Calculator