Methodology and honest limits
The figures on this page were checked against the four plaster calculators India actually uses, on 16 November 2026. All four were read in full (raw copies in sources/). The competitor pages: TheCivilStudies' plaster calculation guide (dry volume 1.27, plus 20% for joints, uneven surface and wastage — wet × 1.20, then × 1.27 = 1.524; cement = dry × cement part ÷ sum of parts; bags = cement m³ × 1,440 ÷ 50; sand = dry × sand part ÷ sum, × 35.315 for cft; 100 m² of 12 mm plaster in 1:6 = 7.5 bags and 55.4 cft; one bag plasters about 13.3 m² at 12 mm in 1:6; ready table per 100 m² — 6 mm 1:3: 6.6 bags / 24.2 cft, 12 mm 1:6: 7.5 / 55.4, 12 mm 1:4: 10.5 / 51.7, 15 mm 1:6: 9.4 / 69.2, 15 mm 1:4: 13.2 / 64.6, 20 mm 1:4: 17.6 / 86.1; worked room 4.0 m × 3.5 m × 3.0 m = about 4 bags and 26.4 cft); Civilsite's plaster calculator (dry volume = wet × 1.33, stated as an estimating assumption with no allowance; cement = dry ÷ total parts ÷ 0.0347 m³ per bag; 100 m² of 12 mm plaster in 1:6 = 6.6 bags, 1.37 m³ / 48.3 cft / 2.19 tonnes of sand; 12 mm 1:4 = 9.2 bags, 15 mm 1:4 = 11.5 bags; thickness and mix from the specified item per IS 1661:1972 and CPWD Specifications Volume 2; a 5% purchase allowance would make it 6.9 bags and 50.7 cft); Calcvind's plaster calculator (dry volume = wet × 1.27, plus 20% extra for uneven surfaces and wastage; 1000 sq ft of 12 mm plaster in 1:6 = 7 bags and 51.4 cft; about 0.7 bag per 10 m² at 12 mm in 1:6, about 1 bag in 1:4; thickness and mix table — 6 mm ceiling, 12 mm internal walls, 15 mm rough side, 20 mm external walls in two coats; mixes 1:3 strong, 1:4 external and ceilings, 1:5, 1:6 internal); and CalculatorApp's plaster quantity calculator (dry volume = area × thickness × 1.3 bulking factor in one place and × 1.35 in another; cement bags = ceiling of cement weight ÷ bag size; 100 m² of 12 mm plaster in 1:6 with 10% wastage = 7.33 bags and 1.527 m³ of sand; 0.67 bags per 10 m² at 12 mm in 1:6 on the 1.35 factor; IS 1661 limits a single coat to 12–15 mm, with at least 24 hours between coats). Where the sources disagree, the page states it. The disagreement that matters is the dry factor: 1.524, 1.33, 1.485 and 1.60 are four different allowances for the same job, and this page uses 1.60 (1.33 × 1.20) and prints all four answers for the same 100 m² so the reader can see the difference. The densities used are the Sand Calculator's (river 1,600, M-sand 1,750, P-sand 1,650 kg/m³), reused verbatim so the two tools agree. This tool is distinct from the Sand Calculator (entry 379, queued): that tool computes the sand only, while this tool computes the cement and sand for plaster — the Sand Calculator is named in plain words on this page and will be linked once it is live, as will the Cement Calculator (entry 361, queued). For related tools, the EMI Calculator works out any loan's monthly payment, the SIP Calculator covers savings growth, the PPF Calculator covers the Public Provident Fund, the FD Calculator covers fixed deposits, the Income Tax Calculator works out tax under both regimes, the Percentage Calculator and GST Calculator cover everyday percentages and tax, the CGPA Calculator converts CGPA to percentage, the BMI Calculator works out body mass index, and the HRA Calculator works out the house rent allowance exemption. Last updated 16 November 2026.
The arithmetic on this page is exact: wet volume is area × thickness; dry volume is wet volume × 1.60 (1.33 dry-volume factor × 1.20 allowance for joints, uneven surface and wastage); cement is dry volume × cement parts ÷ total parts (1:3, 1:4, 1:5, 1:6); cement bags are cement m³ × 1,440 ÷ 50 (0.0347 m³ per 50 kg bag); sand is dry volume × sand parts ÷ total parts; sand in cft is m³ × 35.3147; one brass is 100 cft (2.8317 m³); weight is m³ × density (river sand 1,600, M-sand 1,750, P-sand 1,650 kg/m³); cement cost is bags × ₹/bag when a bag rate is entered, sand cost is cft × ₹/cft when a cft rate is entered, otherwise brass × ₹/brass. Rounding is round-half-up (1e-9 nudge): m³ to 3 decimals, cement bags to 2, cft to 2, brass to 3, kg to whole kg, tonnes to 3, cost to whole rupees; derived quantities are computed from the unrounded intermediates, then rounded. Two brief figures were corrected by exact arithmetic and are documented in sources.md: the sand-pack anchor's sand is 0.143 m³ and 5.04 cft, not 0.142 m³ and 5.03 cft (0.111483648 × 1.60 × 4/5 = 0.142699), and the sample's sand cft is 58.12, not about 58.1 (1.645714 × 35.3147 = 58.119). Validation: area 0.1–100,000 (sq ft or m²); thickness 3–50 mm (presets 6, 12, 15, 20 mm); mix 1:3/1:4/1:5/1:6; sand type river, M-sand or P-sand; rates 0–100,000 (0 means not entered). Invalid inputs return null, never a result.
Honest limits: this is an estimate for ordering, not a quote. The dry factor is an allowance for joints, uneven surface and wastage, not a measured quantity — Civilsite states its 1.33 factor the same way, as an estimating assumption to be reconciled with the project estimate, approved method, trial yield and actual consumption. Densities are bulk averages for dry, clean sand — damp sand is heavier, so weigh the delivered load against the supplier's slip rather than this page. Bulking of sand — the volume increase of damp fine sand, 15–30% at 4–6% moisture per IS 2386 (Part 3) — is not modelled here; if your sand is visibly damp, order on the dry-volume figure and check the first load. No price is fixed anywhere on this page: the cost uses the rates you enter, and rates vary by city, season and distance from the quarry. Thickness and mix must come from the specified item: IS 1661 limits a single coat to 12–15 mm, so anything thicker goes on in two coats with at least 24 hours between them. Nothing you type is uploaded or stored: the calculation runs in your browser.