Free cement calculator

Cement Calculator

Pick concrete, plaster or brickwork mortar, enter the size, and get the cement in 50 kg bags — exact and rounded up to whole bags to buy — plus the sand, aggregate and water, and the cost at your own ₹ per bag rate. Everything runs in your browser; nothing you type is sent or saved.

✓ Free to use ✓ No signup ✓ Browser calculation
100 bags to buy for the sample On the sample: a 10 × 8 m slab, 150 mm thick, M20 — 96.83 bags exact, 4838 kg of cement, 5.04 m³ of sand
6 sources checked TheCivilStudies, NineClip, DevCalc, Whiz.tools, CalculatorLib and Construction Estimator India — the figures this page does not reproduce are shown with the reason
Checked 15 November 2026 TheCivilStudies, NineClip, DevCalc, Whiz.tools, CalculatorLib and Construction Estimator India — see the methodology at the foot of the page

Nominal-mix estimate for ordering, not a mix design. Nominal-mix estimate for ordering, not a mix design. No fixed cement price is printed on this page — rates vary by brand and region.

How many bags of cement do I need?

Concrete uses the dry-volume method (× 1.54); plaster and brickwork mortar use the dry-mortar method (× 1.33).

In feet mode, concrete thickness is in inches and wall area is in square feet.

Length in metres (0.05–100), or feet in feet mode (0.2–330).

Width in metres (0.05–100), or feet in feet mode (0.2–330).

Thickness in metres (0.01–10), or inches in feet mode (0.5–400). A home slab is usually 100–150 mm (4–6 in).

M20 is the minimum grade for reinforced slabs, beams and columns in homes under IS 456. Nominal mixes are allowed only up to M20 — M25 needs a design mix.

Added to the cement bags only (0–15%). The usual allowance is 3%.

Your local price per bag. Leave blank for quantities only — the page prints no fixed cement price, because rates vary by brand and region.

The calculator runs entirely in your browser — nothing you type is sent or saved.

One 50 kg bag of cement is 0.0347 m³ at 1,440 kg/m³. Bags to buy is always rounded up to whole bags.

100 BAGS TO BUY · 96.83 BAGS EXACT · 4838 KG

100 BAGS TO BUY · 96.83 BAGS EXACT · 4838 KG

CONCRETE · M20 (1:1.5:3)

Buy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete — order 100 bags.

96.83 bags exact · 100 bags to buy · 4838 kg · no rate entered for 12.00 m³ of M20 concrete

Cement bags, exact
96.83 bags
Bags to buy
100 bags
Cement
4838 kg
Sand
5.04 m³ (178.0 cft)
Aggregate
10.08 m³ (356.0 cft)
Total cost
No rate entered

Buy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete.

Buy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete. 96.83 bags exact, 100 bags to buy, no rate entered.

Buy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete — order 100 bags.

Wet volume 12.00 m³ (423.8 cft) from 10 m × 8 m × 0.15 m.
Dry volume 18.48 m³ — wet volume × 1.54. Wastage is added to the cement bags only, not to the sand or aggregate. Cement 3.36 m³ (4838 kg) = 18.48 m³ dry × 1/5.5 parts. That is 96.83 bags; with 3% wastage, buy 100 bags.

Quantities are estimates for ordering, not a bill of quantities. Sand bulking and moisture are not modelled.

FigureAmountNote
Wet volume12.00 m³ (423.8 cft)10 × 8 × 0.15 m.
Dry volume18.48 m³Wet volume × 1.54.
Cement96.83 bags (4838 kg)18.48 m³ dry × 1:1.5:3.
Sand5.04 m³ (178.0 cft)8064 kg.
Aggregate10.08 m³ (356.0 cft)16128 kg.
Water2419 litresAt a water–cement ratio of 0.5 — indicative only.
Bags to buy100 bags96.83 bags exact, plus 3% wastage.
VerdictBuy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete.Concrete.
  • Wet volume 12.00 m³ (423.8 cft) from 10 m × 8 m × 0.15 m.
  • Dry volume 18.48 m³ — wet volume × 1.54. Wastage is added to the cement bags only, not to the sand or aggregate.
  • Cement 3.36 m³ (4838 kg) = 18.48 m³ dry × 1/5.5 parts. That is 96.83 bags; with 3% wastage, buy 100 bags.
  • Sand 5.04 m³ (178.0 cft, 8064 kg); aggregate 10.08 m³ (356.0 cft, 16128 kg).
  • Water 2419 litres at a water–cement ratio of 0.5 (4838 kg × 0.5) — indicative only; the water actually needed depends on the sand moisture and the slump.
  • Nominal-mix estimate, not a mix design. The 1.54 factor is an estimating convention, not a mix-design clause — sand bulking and moisture are not modelled.

Figures as of 15 November 2026.

Recent calculations

No calculations yet — work one out above.

The sample: a 10 × 8 m slab, 150 mm, M20 — 100 bags to buy

The sample is a 10 × 8 m slab, 150 mm thick, in M20 — 12.00 m³ wet, 18.48 m³ dry, 96.83 bags exact and 100 bags to buy with the default 3% wastage. TheCivilStudies prints 8.1 bags per m³ for M20 and NineClip 8.07 — this page gives 8.07.

FigureAmountNote
Wet volume 12.00 m³ (423.8 cft) 10 × 8 × 0.15 m.
Dry volume 18.48 m³ Wet volume × 1.54.
Cement 96.83 bags (4838 kg) 18.48 m³ dry × 1:1.5:3.
Sand 5.04 m³ (178.0 cft) 8064 kg.
Aggregate 10.08 m³ (356.0 cft) 16128 kg.
Water 2419 litres At a water–cement ratio of 0.5 — indicative only.
Bags to buy 100 bags 96.83 bags exact, plus 3% wastage.
Verdict Buy 100 bags of cement (96.83 bags exact, 4838 kg) for 12.00 m³ of M20 concrete. Concrete.

What does a cement calculator do?

It turns a measured slab, wall or brick count into the cement you need to order. Cement is bought in 50 kg bags, so every concreting or plastering job comes down to one conversion: a volume into bags. You pick the job, enter the size, and it works out the wet volume, the dry volume, the cement in bags — exact and rounded up to whole bags to buy — and the sand, aggregate and water, with the cost if you enter your own ₹ per bag rate. The arithmetic is the dry-volume method every Indian site calculator uses: wet volume × 1.54 for concrete, wet mortar × 1.33 for plaster and brickwork, and one 50 kg bag of cement is 0.0347 m³. It is an estimate for ordering cement, not a mix design — and where the published calculators disagree, this page prints the difference with the reason instead of silently following one of them.

From a measured slab to a supplier order, in four steps

  1. Pick the job

    Concrete for a slab, beam, column or footing; plaster for wall plastering; brickwork mortar for a brick wall. Each job has its own method, and the calculator switches to it.

  2. Enter the size

    For concrete: length, width and thickness, in metres — or feet, with the thickness in inches — and the grade. For plaster: the wall area and the thickness. For brickwork: the wall area and thickness, or the brick count.

  3. Add wastage and your rate

    Wastage (default 3%) is added to the cement bags only. The ₹ per bag rate is optional — enter your supplier's rate to see the cost, or leave it blank for quantities only.

  4. Read the bags — and check it against the working

    Bags exact, bags to buy, cement in kg, sand, aggregate and water, and the cost at your rate. Every figure shows its working underneath, so you can check it by hand.

How the bags are worked out

The method is the dry-volume method, checked on 15 November 2026 against the six cement calculators India actually uses. For concrete, the wet volume is length × width × thickness; the dry volume is the wet volume × 1.54; the nominal mix splits the dry volume by parts — M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4, M20 1:1.5:3, M25 1:1:2 (IS 456:2000 Table 9) — and the cement volume ÷ 0.0347 m³ gives the bags. For plaster, the wet mortar is the wall area × thickness and the dry mortar is the wet mortar × 1.33. For brickwork, the wet mortar is the wall volume less the solid brick volume (modular 190 × 90 × 90 mm bricks with a 10 mm joint — 0.2305 m³ of mortar per m³ of brickwork) and the dry mortar is again × 1.33. Wastage (default 3%) is added to the cement bags only, and bags to buy is rounded up to whole bags. Cost is bags to buy × the rate you enter; the page prints no fixed cement price. IS 456 allows nominal mixes only up to M20 — M25 needs a design mix to IS 10262:2019. Published figures that do NOT reproduce on this page are shown with the reason: CPWD's 8.00 bags/m³ for M20 and IS 10067:1982's 7.33 against this page's 8.07; CalculatorLib's 8.23 bags for a 2 m³ 1:2:4 slab against this page's 12.68, because it leaves out the 1.54 factor; Construction Estimator India's 8.6 bags/m³ for M25 against this page's 11.09, which is inconsistent with its own 1:1:2 ratio; and InteriorCalculator's 286 litres of water against this page's 285, because it converts at 35.3 cft/m³ while this page uses 35.3147.

Eleven pours, eleven bag counts

Eleven worked examples from the calculators India actually uses — each one reproduced exactly by this calculator, except where a difference is stated.

The sample: a 10 × 8 m slab, 150 mm, M20 — 100 bags to buy

The sample: a 10 × 8 m slab, 150 mm thick, in M20. The wet volume is 12.00 m³, the dry volume 18.48 m³, and the cement is 96.83 bags exact — 100 bags to buy with the default 3% wastage. Sand 5.04 m³, aggregate 10.08 m³, water 2419 litres.

96.83 bags exact · 100 bags to buy · 4838 kg · no rate entered.

Construction Estimator India's footing: 1.35 m³, M20 — 11 bags

Construction Estimator India's footing example: a 1.5 × 1.5 × 0.6 m footing is 1.35 m³ and takes 12 bags to buy — it prints 11 bags (its rounded exact count). This page gives 10.89 bags exact, 11 at whole bags before wastage, and 12 with the default 3% wastage.

10.89 bags exact · 12 bags to buy · 544 kg · no rate entered.

Worldofcalcs' slab: 20 × 15 ft, 5 in, M20 — 28.56 bags exact

Worldofcalcs' worked example: a 20 × 15 ft slab, 5 in thick, in M20. It prints 3.54 m³ wet, 5.45 m³ dry and 28.56 bags exact, 29 to buy. This page gives the same 28.56 bags exact at 0% wastage; with the default 3% wastage it gives 28.56 bags exact and 30 to buy.

28.56 bags exact · 30 bags to buy · 1427 kg · no rate entered.

NineClip's plaster: 100 sq ft at 12 mm, 1:6 — 0.61 bags

NineClip's plaster figure: 100 sq ft at 12 mm in 1:6 takes 0.61 bags, or 0.63 with its 3% wastage allowance. This page gives 0.61 bags exact — 0.63 with the same 3% wastage — and 1 bag to buy. No fetched source states the 3–4 bags per 100 sq ft that some charts quote; that figure is about five times too high.

0.61 bags exact · 1 bags to buy · 31 kg · no rate entered.

Plastering a room: 40 m² at 12 mm, 1:4 — 4 bags to buy

Plastering a room: 40 m² of wall at 12 mm in 1:4. The wet mortar is 0.48 m³, the dry mortar 0.64 m³, and the cement is 3.68 bags exact — 4 bags to buy. Sand 0.51 m³ (18.0 cft).

3.68 bags exact · 4 bags to buy · 184 kg · no rate entered.

A 10 m² brick wall, 9 in, 1:6 — 3 bags to buy

A 10 m² brick wall, 9 in thick, in 1:6 mortar. The wall is 2.29 m³, the wet mortar 0.53 m³ and the dry mortar 0.70 m³ — the cement is 2.89 bags exact, 3 bags to buy. That is 0.25 bags per 100 bricks, not the 1.25 sometimes quoted online.

2.89 bags exact · 3 bags to buy · 144 kg · no rate entered.

1,000 modular bricks, 1:6 — 3 bags to buy

1,000 modular bricks in 1:6 mortar. The wall volume is 2.00 m³, the wet mortar 0.46 m³ and the cement 2.52 bags exact — 3 bags to buy, or 0.25 bags per 100 bricks. The site's Brick Calculator gives the same mortar by the same volume method.

2.52 bags exact · 3 bags to buy · 126 kg · no rate entered.

One cubic metre of M20 — 8.07 bags (8.1 printed)

One cubic metre of M20 concrete takes 8.07 bags of cement (403 kg). TheCivilStudies prints 8.1 bags (403 kg) and NineClip 8.07 — both reproduce. CPWD rate analysis gives 8.00 bags and IS 10067:1982 gives 7.33 — the spread is real and is stated on the page.

8.07 bags exact · 9 bags to buy · 403 kg · no rate entered.

One cubic metre of M25 nominal — 11.09 bags (do not order on it)

One cubic metre of M25 at the nominal 1:1:2 ratio takes 11.10 bags (554 kg). That is the site-practice figure — IS 456 allows nominal mixes only up to M20, and a design mix to IS 10262:2019 usually needs only about 7–8 bags per m³. Do not order M25 on the 1:1:2 shortcut.

11.10 bags exact · 12 bags to buy · 554 kg · no rate entered.

The thumb rule: 0.4 bags per sq ft — 400 bags for 1,000 sq ft

The whole-house thumb rule: about 0.4 bags per sq ft of built-up area, so a 1,000 sq ft house needs roughly 400 bags. NineClip gives a 0.35–0.50 range (350–500 bags for 1,000 sq ft) and DevCalc 400–700 bags. It is a planning figure only — the calculator above is the way to order.

96.83 bags exact · 100 bags to buy · 4838 kg · no rate entered.

The sample slab at ₹400 a bag — ₹40,000

The sample slab at ₹400 a bag: 100 bags × ₹400 = ₹40,000. This page prints no cement price of its own — enter your supplier's rate. DevCalc's 2026 range for a cubic metre of M20 is ₹380–520 a bag, and Construction Estimator India quotes the same range.

96.83 bags exact · 100 bags to buy · 4838 kg · ₹40,000 total.

Cement bags per cubic metre of concrete (M5–M25)

Every row in this table is computed by this page from the dry-volume method, and every row matches TheCivilStudies' published table at the printed precision. NineClip's chart gives the same figures to two decimal places. The M20 row has two more published answers — CPWD 8.00 and IS 10067:1982 7.33 — and the M25 row is nominal site practice, not code.

Grade and mixBags per m³Cement per m³What the sources print
M5 concrete — 1:5:10 2.77 bags per m³ 139 kg cement per m³ TheCivilStudies prints 2.8 bags; M5 is 1:5:10, not 1:4:8.
M7.5 concrete — 1:4:8 3.41 bags per m³ 171 kg cement per m³ TheCivilStudies prints 3.4 bags; NineClip 3.41.
M10 concrete — 1:3:6 4.44 bags per m³ 222 kg cement per m³ TheCivilStudies prints 4.4 bags; NineClip 4.44.
M15 concrete — 1:2:4 6.34 bags per m³ 317 kg cement per m³ TheCivilStudies prints 6.3 bags; NineClip 6.34.
M20 concrete — 1:1.5:3 8.07 bags per m³ 403 kg cement per m³ TheCivilStudies prints 8.1 bags; NineClip 8.07; CPWD 8.00; IS 10067 7.33.
M25 concrete — 1:1:2 11.10 bags per m³ 554 kg cement per m³ TheCivilStudies prints 11.1 bags — nominal only; a design mix needs about 7–8 bags.

Plaster: cement bags per 100 sq ft

Bags exact per 100 sq ft of plaster, before wastage — add your wastage % in the calculator above. The 12 mm, 1:6 figure (0.61 bags) is NineClip's published figure and reproduces exactly.

Plaster thickness1:31:41:51:6
6 mm0.53 bags0.43 bags0.36 bags0.31 bags
12 mm1.07 bags0.85 bags0.71 bags0.61 bags
15 mm1.34 bags1.07 bags0.89 bags0.76 bags
20 mm1.78 bags1.42 bags1.19 bags1.02 bags

Brickwork: cement bags per 10 m² of wall

Bags exact per 10 m² of brick wall, before wastage — modular 190 × 90 × 90 mm bricks with a 10 mm joint, by the volume method (0.2305 m³ of mortar per m³ of brickwork). The same method as the site's Brick Calculator.

Wall thickness1:41:51:6
4.5 in (half-brick)2.02 bags1.68 bags1.44 bags
9 in (full-brick)4.04 bags3.37 bags2.89 bags

Whole-house thumb rule: bags per sq ft of built-up area

Planning figures only — a rough count for budgeting a whole house, not an order. NineClip gives 0.35–0.50 bags per sq ft (350–500 bags for a 1,000 sq ft house) and DevCalc 400–700 bags. Measure the pours with the calculator above to order.

Built-up areaAt 0.35 bags per sq ftAt 0.40 bags per sq ftAt 0.50 bags per sq ft
500 sq ft175 bags200 bags250 bags
1,000 sq ft350 bags400 bags500 bags
1,500 sq ft525 bags600 bags750 bags
2,000 sq ft700 bags800 bags1,000 bags
2,500 sq ft875 bags1,000 bags1,250 bags

Every figure on the sample, and how it is worked out

Each figure on the sample — a 10 × 8 m slab, 150 mm thick, in M20 — with the rule behind it. The step that surprises people is the dry-volume factor: the dry materials measure 1.54 times the finished concrete.

FigureHow it is worked outTypicalOn the sample
Wet volume Length × width × thickness A 10 × 8 m slab at 150 mm is 12 m³ 12.00 m³ (423.8 cft)
Dry volume Wet volume × 1.54 The dry materials measure about half as much again as the finished concrete 18.48 m³
Cement bags, exact Dry volume × cement parts ÷ 0.0347 m³ a bag 8.07 bags per m³ of M20 96.83 bags
Bags to buy Bags exact × (1 + wastage), rounded up Always round up — cement is sold in whole bags 100 bags
Cement weight Cement volume × 1,440 kg/m³ 403 kg per m³ of M20 4838 kg
Sand and aggregate Their parts of the dry volume 0.42 m³ sand and 0.84 m³ aggregate per m³ of M20 5.04 m³ sand, 10.08 m³ aggregate
Water Cement kg × 0.5 Indicative only — it depends on sand moisture and slump 2419 litres

The rules behind the answer

Seven rules, each one checkable against the sources. Nothing here is a guess — and where the sources disagree, the page says so.

Concrete uses the dry-volume method (× 1.54)

Wet volume × 1.54 gives the dry volume — wet concrete shrinks as it sets and the voids between the sand and aggregate have to be filled. TheCivilStudies, NineClip, DevCalc, Whiz.tools and Construction Estimator India all use 1.54 (textbooks give 1.52–1.57). CalculatorLib's default formula leaves it out: its 2 m³ 1:2:4 example gives 8.23 bags where this page gives 12.68 — about 35% less — and it admits the omission on its own page.

Nominal mixes come from IS 456:2000 Table 9 — M5 is 1:5:10

IS 456:2000 Table 9 lists the nominal mixes: M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4 and M20 1:1.5:3. M5 is 1:5:10 — TheCivilStudies' table gives 2.8 bags per m³ for M5, which only 1:5:10 reproduces (1:4:8 would give 3.41). CalculatorLib prints the same table. M25 has no nominal mix in Table 9.

IS 456 allows nominal mixes only up to M20

IS 456:2000 cl. 9.1.1 and Table 9 allow nominal mixes only up to M20; M25 and above need a design mix to IS 10262:2019, based on actual materials and trials. A design mix usually needs only about 340–400 kg of cement per m³ (7–8 bags), against the 554 kg that 1:1:2 gives — and 1:1:2 is above the 450 kg/m³ ceiling in IS 456 cl. 8.2.4.2. Construction Estimator India prints 8.6 bags/m³ for M25, which is inconsistent with its own 1:1:2 ratio (11.09) — that figure is not used. This page shows the M25 nominal figures for reference and carries the warning on every M25 result.

One bag is 50 kg — 0.0347 m³ at 1,440 kg/m³

Cement bulk density is 1,440 kg/m³ (IS 875 Part 1), so one 50 kg bag is 50 ÷ 1,440 = 0.0347 m³ (1.23 cft). Bags = cement volume ÷ 0.0347. The weight path (cement kg ÷ 50) gives a fraction less — 8.06 bags/m³ for M20 against 8.07 by volume — because 0.0347 × 1,440 = 49.97 kg, not quite 50. TheCivilStudies prints 8.06 in its worked example and 8.1 in its table; NineClip prints 8.07. Whiz.tools counts 40 kg bags, so its bag counts are not directly comparable to Indian 50 kg figures.

Plaster uses the dry-mortar factor 1.33

Wet mortar is the wall area × thickness; dry mortar is wet × 1.33 — the voids and shrinkage factor every source uses for mortar (NineClip, and the site's Brick Calculator). NineClip's figure for 100 sq ft at 12 mm in 1:6 is 0.61 bags, 0.63 with its 3% wastage allowance — this page gives 0.61 and 0.63 exactly. Charts quoting 3–4 bags per 100 sq ft are about five times the dry-volume figure (0.61–0.85 bags), and no fetched source states them.

Brickwork mortar is worked out by volume, not by a flat allowance

Mortar is not a flat allowance per cubic metre of wall — it is the wall volume less the solid brick volume. With modular 190 × 90 × 90 mm bricks and a 10 mm joint, a cubic metre of brickwork holds 0.2305 m³ of mortar. That gives 0.25 bags per 100 bricks at 1:6 (2.52 bags per 1,000). The figure sometimes quoted online, 1.25 bags per 100 bricks at 1:6, would need about 1.15 m³ of mortar per m³ of brickwork — more mortar than the wall can hold. The site's Brick Calculator gives the same mortar by the same volume method.

M20 has three published answers — 8.07, 8.00 and 7.33

This page gives 8.07 bags/m³ for M20 by the volumetric method (1.54 ÷ 5.5 ÷ 0.0347). CPWD rate analysis gives 8.00 bags (4.00 quintal/m³) and IS 10067:1982 gives 7.33 bags — a spread of about 10%, stated explicitly by NineClip. The three figures come from different conventions: the volumetric method, a rate-analysis allowance and a standard consumption figure. This page uses the volumetric method and prints all three, so an order checked against any of them is within 10%.

Common cement calculator mistakes to avoid

VOLUME
Forgetting the dry-volume factor — Applying the mix ratio to the wet volume understates the cement by about 35% — CalculatorLib's default formula does exactly this and admits it. Always multiply by 1.54 first.
MIX
Using 1:4:8 for M5 concrete — M5 is 1:5:10 in IS 456 Table 9, not 1:4:8. The 1:4:8 mix is M7.5. Using the wrong ratio gives 3.41 bags per m³ where M5 needs 2.77.
BAGS
Ordering the exact bag count — Cement is sold in whole 50 kg bags, and spillage and handling lose some — the calculator adds wastage and rounds up. Ordering 96.83 bags is impossible; order 100.
UNITS
Mixing feet and inches — In feet mode the slab thickness is in inches, not feet — 5 in is 0.127 m, not 1.524 m. A 20 × 15 ft slab at 5 in is 3.54 m³; entered as 5 ft thick it would be 42.48 m³ — twelve times too much.
M25
Ordering M25 on the 1:1:2 shortcut — 1:1:2 gives 554 kg of cement per m³, above the 450 kg ceiling, and a design mix usually needs only 340–400 kg. Ordering on 1:1:2 wastes cement and risks heat and shrinkage cracking.

Before you trust the result

  • Did you enter the length, width and thickness in the same unit — metres, or feet with the thickness in inches?
  • Is the grade right — M20 for reinforced slabs, beams and columns, M10/M15 for plain concrete, M5/M7.5 for lean concrete?
  • For plaster, is the thickness 12 mm for internal walls — not 20 mm by mistake?
  • For brickwork, is the wall 4.5 in or 9 in — and did you enter the brick count only if you counted bricks?
  • Is the mortar mix right — 1:4 for internal plaster and brickwork, 1:6 for the leanest work?
  • Did you add wastage — the default 3% is added to the cement bags only?
  • Did the bags to buy round up — never down?
  • Is the rate your supplier's current ₹ per bag — not a price from an old chart?
  • For M25, do you have a design mix — not just the 1:1:2 shortcut?
  • Do you remember this is a nominal-mix estimate — sand bulking and moisture are not modelled?

Cement calculator FAQs

How many cement bags are needed for 1 cubic metre of M20 concrete?
8.07 bags exact (403 kg), so 9 bags to buy with the usual 3% wastage (8.31 bags). TheCivilStudies prints 8.1 bags and NineClip 8.07 — both reproduce. CPWD rate analysis gives 8.00 bags and IS 10067:1982 gives 7.33 — the spread is real and is stated on the page.
How do I calculate cement bags for a slab?
Work out the wet volume (length × width × thickness), multiply by 1.54 for the dry volume, and take the cement's share of the mix — for M20, 1 part in 5.5. One 50 kg bag is 0.0347 m³, so bags = cement volume ÷ 0.0347. A 10 × 8 m slab, 150 mm thick, in M20 is 12 m³ wet and needs 96.83 bags exact — 100 bags to buy with 3% wastage.
What is the dry volume factor 1.54?
Wet concrete shrinks as it sets and the voids between the sand and aggregate have to be filled, so the dry materials measure more than the finished concrete — about 1.54 times as much. Every Indian site calculator uses 1.54 (textbooks give 1.52–1.57). CalculatorLib's default formula leaves it out and understates the cement by about 35% — it admits this on its own page.
How many bags of cement for 100 sq ft of plaster at 12 mm?
0.61 bags in a 1:6 mix and 0.85 bags in a 1:4 mix — so 1 bag to buy either way, with 3% wastage 0.63 and 0.88 bags. NineClip prints 0.61 bags for the 1:6 case and reproduces exactly. Charts quoting 3–4 bags per 100 sq ft are about five times too high.
How much cement is needed for 1,000 bricks?
2.52 bags exact in a 1:6 mix (3 bags to buy), or 0.25 bags per 100 bricks. The mortar is worked out by volume: a cubic metre of brickwork holds 0.2305 m³ of mortar with modular bricks. The figure sometimes quoted online, 1.25 bags per 100 bricks, would need more mortar than the wall can hold.
What is the cement mix ratio for M20 concrete?
1:1.5:3 by volume — one part cement, one and a half parts sand, three parts aggregate. The nominal mixes in IS 456:2000 Table 9 are M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4 and M20 1:1.5:3. M25 is not a nominal mix — it needs a design mix to IS 10262:2019.
Can I use 1:1:2 for M25 concrete?
Only as a site-practice reference, not as a specification. IS 456 allows nominal mixes only up to M20, and 1:1:2 gives 554 kg of cement per m³ — above the 450 kg/m³ ceiling in IS 456 cl. 8.2.4.2. A design mix for M25 usually needs only about 340–400 kg per m³ (7–8 bags). This page shows the 1:1:2 figures (11.10 bags) with the warning on every M25 result.
How many bags of cement do I need for a 1,000 sq ft house?
Roughly 400 bags at the 0.4-bags-per-sq-ft thumb rule (NineClip's range is 350–500 bags; DevCalc gives 400–700). It is a planning figure only — measure each slab, wall and plaster area with the calculator above to order.
Should I add wastage to my cement order?
Yes — the calculator adds a wastage percentage (default 3%, up to 15%) to the cement bags, and rounds up to whole bags. The sand, aggregate and water are shown at the theoretical quantity. NineClip uses the same 3% allowance; CalculatorLib suggests 5–10% and Whiz.tools 5–20%.
Is the water figure exact?
No — it is indicative. The water is the cement weight × 0.5, the usual water–cement ratio, but the water actually needed depends on the sand moisture and the slump you want. The sample slab's 2,419 litres is a starting point, not a batching instruction.

Methodology and honest limits

The arithmetic on this page was checked against the six cement calculators people actually use, on 15 November 2026. All six were fetched in full: TheCivilStudies' Cement Bags in 1 m³ of Concrete (1 m³ table for all six grades — M5 2.8 bags / 139 kg / 0.48 / 0.96, M7.5 3.4 / 171 / 0.47 / 0.95, M10 4.4 / 222 / 0.46 / 0.92, M15 6.3 / 317 / 0.44 / 0.88, M20 8.1 / 403 / 0.42 / 0.84, M25 11.1 / 554 / 0.39 / 0.77 — every figure reproduces within the printed precision; worked example 1.54 ÷ 5.5 = 0.28 m³ cement × 1,440 = 403.2 kg ÷ 50 = 8.06 bags; water at w/c 0.50 ≈ 202 litres per m³ of M20; IS 456:2000 cl. 9.1.1 and Table 9, cl. 8.2.4.2, and IS 10262:2019, cited; M25 design mix uses only about 340–400 kg/m³); NineClip Build's Cement Calculator (bags/m³ before wastage — M7.5 3.41, M10 4.44, M15 6.34, M20 8.07, M25 11.10 — every figure reproduces; M20 8.1 bags, 8.3 with 3% wastage, 9 to buy; plaster 100 sq ft at 12 mm in 1:6 = 0.61 bags, 0.63 with wastage — reproduces exactly; worked example 20 × 10 ft face, 12 mm, 1:6 = 1.22 bags — reproduces; M20 cross-check stated explicitly: CPWD rate analysis 4.00 quintal/m³ = 8.00 bags, IS 10067:1982 = 7.33 bags; thumb rule 0.35–0.50 bags per sq ft; cites IS 456:2000 cl. 9.3 / Table 9, IS 10262, IS 2250, IS 269:2015, IS 1489, IS 455 and IS 4082); DevCalc's Cement Calculator (ratios M10 1:3:6, M15 1:2:4, M20 1:1.5:3; dry factor 1.54; bag 50 kg = 0.0347 m³ / 1.226 cft; density 1,440 kg/m³; thumb rule 400–700 bags for a 1,000 sq ft house; cites IS 456:2000); Whiz.tools' Cement Quantity Calculator (M15 316.8 kg/m³ — reproduces; its bag counts use 40 kg bags, not Indian 50 kg bags, so they are not directly comparable; density 1,440 kg/m³ citing IS 875 Part 1); CalculatorLib's Cement Calculator (nominal-mix table M5 1:5:10, M7.5 1:4:8, M10 1:3:6, M15 1:2:4, M20 1:1.5:3, M25 1:1:2; bag 50 kg = 0.0347 m³; density 1,440 kg/m³ citing IS 875 (Part 1):1987 — but its default formula applies the mix fraction directly to the wet volume with NO 1.54 dry-volume factor, so its 2 m³ 1:2:4 example gives 8.23 bags where this page gives 12.68 — it admits the omission on its own page); and Construction Estimator India's Cement Calculator for Foundation (M20 8 bags/m³; M15 6.5; footing 1.5 × 1.5 × 0.6 m = 1.35 m³ → 11 bags — reproduces; 16 footings 11.5 m³ → 92 bags; but its M25 figure of 8.6 bags/m³ is inconsistent with its own 1:1:2 ratio, which gives 11.09 — it is not used). The brickwork mortar method is the volume method of the site's Brick Calculator (modular 190 × 90 × 90 mm bricks, 10 mm joint — 0.2305 m³ of mortar per m³ of brickwork). This page uses the cement-volume ÷ 0.0347 m³ path for bags (8.07 bags/m³ for M20); the weight path (kg ÷ 50) gives 8.06 — TheCivilStudies prints 8.06 in its worked example and 8.1 in its table. The 0.06% gap is stated on the page. No fixed cement price is printed anywhere — rates vary by brand and region; the 2026 ranges quoted (₹380–520 a bag) are the sources' own indicative ranges. For related tools, the Home Loan EMI Calculator works out the monthly cost of a home loan for the build, the EMI Calculator works out any loan's monthly payment, the Percentage Calculator and GST Calculator cover everyday percentages and tax, the Income Tax Calculator covers tax, the Compound Interest Calculator and SIP Calculator cover savings growth, the PPF Calculator covers the Public Provident Fund, the FD Calculator covers fixed deposits, the CGPA Calculator converts CGPA to percentage, and the BMI Calculator works out body mass index. Last updated 15 November 2026.

Plan around the answer — your cement, your build and the rest

Try different figures or a different job — or run the same check with the related tools for your other plans.

WAM to GPA CalculatorGPA to WAM CalculatorSSC Age CalculatorCGPA to Percentage CalculatorAge CalculatorUPSC Age CalculatorIBPS Age CalculatorRRB Age CalculatorEMI CalculatorSIP CalculatorBMI CalculatorPercentage CalculatorGST CalculatorPPF CalculatorFD CalculatorIncome Tax CalculatorRD CalculatorHome Loan EMI CalculatorGratuity CalculatorHRA CalculatorCompound Interest CalculatorEPF CalculatorNPS CalculatorSSY CalculatorNSC CalculatorSCSS CalculatorPost Office MIS CalculatorKVP CalculatorPersonal Loan EMI CalculatorPost Office Time Deposit CalculatorCar Loan EMI CalculatorAPY CalculatorSWP CalculatorWashing Machine Capacity CalculatorMattress Size FinderLaptop Budget CheckerEvent Planning Budget EstimatorRetirement CalculatorStep-up SIP CalculatorHome Loan Eligibility CalculatorLumpsum CalculatorEducation Loan EMI CalculatorBike Loan EMI CalculatorGold Loan CalculatorCredit Card EMI CalculatorSalary CalculatorSimple Interest CalculatorCAGR CalculatorBMR CalculatorBody Fat CalculatorXIRR CalculatorTDS CalculatorRent vs Buy CalculatorPregnancy Due Date CalculatorOvulation Calculator — Fertile Window & Ovulation Date (India)Discount Calculator — Sale Price, Savings & GST (India)Date Calculator — Days Between Dates, Add Days & Countdown (India)Inflation Calculator — Future Cost, Value Today & CII (India)Stamp Duty Calculator — Property Registration Cost (India)Capital Gains Tax Calculator (India) — LTCG & STCG TaxFuel Cost Calculator (India)Share Average Calculator (India)Advance Tax Calculator (India)Brokerage Calculator (India)Leave Encashment Calculator (India)Rooftop Solar Calculator (India)Home Loan Prepayment Calculator (India)DA Calculator (India)Child Education Calculator (India)Sleep Calculator (India)Home Loan Tax Benefit CalculatorGold Price CalculatorAttendance CalculatorEmergency Fund CalculatorSilver Price CalculatorAC Tonnage CalculatorHouse Construction Cost CalculatorElectricity Bill CalculatorPaint CalculatorTerm Insurance CalculatorHealth Insurance Premium CalculatorTiles CalculatorCar Insurance Premium CalculatorTwo-Wheeler Insurance Premium CalculatorPeriod CalculatorConcrete CalculatorProtein CalculatorBrick CalculatorSteel Weight CalculatorWater Tank CalculatorStaircase CalculatorFalse Ceiling Cost CalculatorModular Kitchen Cost CalculatorInterior Design Cost CalculatorWallpaper CalculatorCredit Card Payoff CalculatorMileage CalculatorEV vs Petrol Running Cost CalculatorRent Receipt GeneratorHome Loan Balance Transfer CalculatorInverter Battery Backup Calculator7th Pay Commission Salary Calculator8th Pay Commission Salary CalculatorPersonal Loan Eligibility CalculatorBusiness Loan EMI CalculatorSand CalculatorPlaster CalculatorRoad Tax CalculatorPlywood CalculatorPackers and Movers Cost CalculatorWater Intake Calculator