Methodology and honest limits
The figures on this page were checked against the three sand calculators India actually uses, on 15 November 2026. All three were read in full (raw copies in sources/). The competitor pages: PropertiesOnline's sand calculator (1 m³ of M20 needs "about 0.42 m³ (~15 cft, ~0.67 tonnes), before wastage"; the formula is stated as wet volume × dry factor × sand share; 1 cft of river sand is about 45 kg at 1,600 kg/m³; dry factor 1.54 for concrete, 1.33 for mortar and plaster); Toolique's sand calculator (1 brass is exactly 100 cft, 2.8317 m³; river sand 1,600 kg/m³ — one brass about 4.53 tonnes — M-sand 1,750 kg/m³ — about 4.95 tonnes — and P-sand 1,650 kg/m³, IS 383:2016 grading zones; bulking 15–30% at 4–6% moisture per IS 2386 Part 3; tractor trolley 1 brass, 6-wheeler tipper 2.5–3 brass, 10/12-wheeler dumper 5–6 brass); and SiteSetu's sand calculator and calculators hub (M20 1 m³ = 8.06 bags cement + 0.42 m³ sand + 0.84 m³ aggregate; per-m³ sand table M10 0.462, M15 0.440, M20 0.420; plaster per 100 sq ft 12 mm 1:4 = 0.136 m³ with a 15% allowance; brickwork per 1 m³ 1:6 = 0.256 m³ sand; a 6 m × 4.5 m M20 slab 150 mm thick needs 1.701 m³ of sand; densities from IS 875 Part 1:1987 Table 1 — dry sand 1,540–1,600 kg/m³, wet sand 1,760–2,000 kg/m³). Two more material calculators were read for demand and cross-checks: BuildEstimate AI's material quantity calculator ("for M20 grade (1:1.5:3 ratio), you first calculate the dry volume (wet volume × 1.54)"; 1 m³ of M20 needs about 8 bags cement, 15 cft sand, 30 cft aggregate) and Apna Basera's material calculator (sand about 1.6 cft per sq ft of built-up area; 1,500 sq ft needs about 2,400 cft of sand; one brass is 100 cft). Where the sources disagree, the page states it. The one disagreement that matters is Toolique's plaster example: 100 sq ft of 12 mm plaster in a 1:4 mix is stated as 0.178 m³ (6.29 cft, 0.063 brass, ~293 kg of P-sand), which reproduces exactly as wet volume × 1.60 with the 4/5 sand share never applied — the 1:4 ratio is never used for the sand. This page applies the share (dry 1.33 × 1.20 = 1.596 ≈ 1.60, then × 4/5) and gives 0.142 m³, 5.03 cft, 0.050 brass, 235 kg — 25% less — and says so on the page, with SiteSetu's 0.136 m³ as the independent cross-check. The densities used are the planning densities PropertiesOnline and Toolique agree on (river 1,600, M-sand 1,750, P-sand 1,650 kg/m³); SiteSetu's IS 875 table also quotes river sand at 1,840 kg/m³, which was not adopted — it conflicts with the 1,540–1,600 kg/m³ the same table gives for dry sand and with both other sources. Nominal mixes per IS 456 Table 9 are allowed only up to M20; M25 and above need a design mix (IS 10262), so the 1:1:2 figure for M25 is an indicative nominal equivalent. This tool is distinct from the Cement Calculator (entry 361, queued): that tool computes the full mix, while this tool computes the sand only — the Cement Calculator is named in plain words on this page and will be linked once it is live. For related tools, the EMI Calculator works out any loan's monthly payment, the SIP Calculator covers savings growth, the PPF Calculator covers the Public Provident Fund, the FD Calculator covers fixed deposits, the Income Tax Calculator works out tax under both regimes, the Percentage Calculator and GST Calculator cover everyday percentages and tax, the CGPA Calculator converts CGPA to percentage, the BMI Calculator works out body mass index, and the HRA Calculator works out the house rent allowance exemption. Last updated 15 November 2026.
The arithmetic on this page is exact: dry volume is wet volume × 1.54 for concrete and × 1.33 for mortar and plaster; sand is dry volume × sand parts ÷ total parts (M10 1:3:6, M15 1:2:4, M20 1:1.5:3, M25 1:1:2; mortar and plaster 1:3, 1:4, 1:5, 1:6); sand in cft is m³ × 35.3147; one brass is 100 cft (2.8317 m³); weight is m³ × density (river sand 1,600, M-sand 1,750, P-sand 1,650 kg/m³); wastage multiplies the sand by (1 + wastage ÷ 100), default 5%, range 0–20%; cost is cft × ₹/cft when a cft rate is entered, otherwise brass × ₹/brass. Rounding is round-half-up (1e-9 nudge): sand m³ to 3 decimals, cft to 2, brass to 3, kg to whole kg, tonnes to 3, cost to whole rupees; derived quantities are computed from the unrounded sand m³, then rounded. Two brief figures were corrected by exact arithmetic and are documented in sources.md: the sample's with-wastage cft is 15.57, not 15.58 (0.441 × 35.3147 = 15.5738), and the plaster example's with-wastage cft is 5.03 and its weight 235 kg, not 5.02 and 234 kg (unrounded sand 0.14234 m³). Validation: work type concrete, brick mortar or plaster; grade M10/M15/M20/M25 for concrete or ratio 1:3/1:4/1:5/1:6 for mortar and plaster; quantity by wet volume (0.01–10,000 m³), dimensions (length and width 0.01–1,000, thickness 0.01–10 m or 0.01–30 ft) or plaster area (1–100,000 sq ft) and thickness (6/12/15/20 mm); sand type river, M-sand or P-sand; wastage 0–20%; rates 0–100,000 (0 means not entered). Invalid inputs return null, never a result.
Honest limits: this is an estimate for ordering, not a quote. Densities are bulk averages for dry, clean sand — damp sand is heavier (SiteSetu's IS 875 table gives wet sand at 1,760–2,000 kg/m³ against 1,540–1,600 dry), so weigh the delivered load against the supplier's slip rather than this page. Bulking of sand — the volume increase of damp fine sand, 15–30% at 4–6% moisture per IS 2386 (Part 3) — is not modelled here; if your sand is visibly damp, order on the dry-volume figure and check the first load. No sand price is fixed anywhere on this page: the cost uses the rate you enter, and rates vary by city, season and distance from the quarry. Nominal mixes per IS 456 Table 9 are allowed only up to M20; M25 and above need a design mix (IS 10262), so the 1:1:2 figure for M25 is an indicative nominal equivalent. Nothing you type is uploaded or stored: the calculation runs in your browser.