Free sand calculator

Sand Calculator

Pick concrete, brick mortar or plaster, give the quantity — a wet volume, dimensions, or a plaster area and thickness — and get the sand in m³, cft, brass and tonnes, with a cost when you enter your supplier's rate. Everything runs in your browser; nothing you type is sent or saved.

✓ Free to use ✓ No signup ✓ Browser calculation
0.441 m³ for the sample (15.57 cft) On the sample: 1 m³ of M20 concrete (1:1.5:3), river sand, 5% wastage — 0.42 m³ before wastage, 0.441 m³ with wastage
0.156 brass · 0.706 tonnes 706 kg of river sand at 1,600 kg/m³. One brass is 100 cft (2.8317 m³) — about 4.53 tonnes of river sand.
Checked 15 November 2026 PropertiesOnline, Toolique and SiteSetu — see the methodology at the foot of the page

Sand only — not cement or aggregate. This tool works out the sand for a job. For the full mix — cement, sand and aggregate together — use the Cement Calculator once it is live.

Work out the sand for your job

Concrete, brick mortar or plaster — the dry factor follows it.

Concrete grade, or the cement:sand ratio for mortar and plaster.

Plaster can also be given as an area in sq ft plus a thickness in mm.

The volume of wet concrete, mortar or plaster (0.01–10,000 m³).

The density decides the weight. P-sand is the fine sand used for plaster.

0–20%. 5% is the usual allowance; plaster on uneven walls can need up to 20%.

Your supplier's rate. Leave blank for no cost.

Used only when no per-cft rate is given. 1 brass = 100 cft.

The calculator runs entirely in your browser — nothing you type is sent or saved.

Dry volume is wet volume × 1.54 for concrete and × 1.33 for mortar and plaster; the sand is the sand share of the mix ratio. No sand price is fixed anywhere — the cost uses the rate you enter.

0.441 M³ · 15.57 CFT · 0.156 BRASS · RIVER SAND

0.441 M³ · 15.57 CFT · 0.156 BRASS · RIVER SAND

CONCRETE · M20 (1:1.5:3) · WET 1 M³ · DRY 1.54 M³ · 5% WASTAGE

0.441 m³ of sand — 15.57 cft (0.156 brass)

0.441 m³ of river sand (15.57 cft, 0.156 brass, 706 kg / 0.706 tonnes), including 5% wastage. Concrete · M20 (1:1.5:3) · wet 1 m³ · dry 1.54 m³ · River sand 1,600 kg/m³

Sand (with wastage)
0.441 m³ (0.42 m³ before wastage)
Sand in cft
15.57 cft (14.83 cft before wastage)
Brass
0.156 brass (0.148 before wastage)
Weight
706 kg (672 kg before wastage)
Tonnes
0.706 t (0.672 t before wastage)
Cost
No rate entered

0.441 m³ of sand — 15.57 cft (0.156 brass)

0.441 m³ of sand — 15.57 cft (0.156 brass). 0.441 m³ of river sand (15.57 cft, 0.156 brass, 706 kg / 0.706 tonnes), including 5% wastage. 0.441 m³ × 35.3147 = 15.57 cft; ÷ 100 = 0.156 brass; × 1,600 kg/m³ = 706 kg (0.706 tonnes). No rate entered, so no cost is shown.

Concrete (M20 (1:1.5:3)) — River sand at 1,600 kg/m³, 5% wastage.

Wet 1 m³ × dry factor 1.54 = 1.54 m³ dry; sand share 1.5 of 5.5 parts → 0.42 m³ before wastage, × 1.05 = 0.441 m³ with 5% wastage.
0.441 m³ × 35.3147 = 15.57 cft; ÷ 100 = 0.156 brass; × 1,600 kg/m³ = 706 kg (0.706 tonnes).

Before wastage: 0.42 m³, 14.83 cft, 0.148 brass, 672 kg. An estimate for ordering, not a quote.

  • 0.441 m³ (15.57 cft, 0.156 brass) of river sand — 706 kg (0.706 tonnes).
  • Concrete (M20 (1:1.5:3)) — dry volume 1.54 m³ from 1 m³ wet, sand share 1.5 of 5.5 parts; 5% wastage included.
  • An estimate for ordering, not a quote: densities are bulk averages (damp sand is heavier), bulking is not modelled, and the rate is the one you entered — check the delivered quantity against the supplier's slip.

Figures as of 15 November 2026.

Recent calculations

No calculations yet — work one out above.

What does a sand calculator do?

It turns a job into the sand it needs: pick concrete, brick mortar or plaster, give the quantity as a wet volume, as dimensions, or — for plaster — as an area and a thickness, and it returns the sand in m³, cft, brass and tonnes, with a cost when you enter your supplier's rate. On the sample — 1 m³ of M20 concrete (1:1.5:3), river sand, 5% wastage — that is 0.441 m³, 15.57 cft, 0.156 brass, 706 kg. This is a sand-only tool: it never computes cement or aggregate. The full mix for the same cubic metre is 8.06 bags of cement, 0.42 m³ of sand and 0.84 m³ of aggregate, and the Cement Calculator — queued, not yet live — is the tool that works all three out. Where the published calculators state a figure differently, this page prints both and says which method it uses.

An estimate for ordering, not a quote. Densities are bulk averages — damp sand is heavier — and no price is fixed anywhere on this page: the cost always uses the rate you enter.

The sample: 1 m³ of M20 concrete — 0.441 m³ of river sand

The sample is 1 m³ of M20 concrete (1:1.5:3), river sand at 1,600 kg/m³, 5% wastage, no rate entered — 0.42 m³ of sand before wastage (14.83 cft, 0.148 brass, 672 kg) and 0.441 m³ with wastage (15.57 cft, 0.156 brass, 706 kg, 0.706 tonnes). Dry volume 1.54 m³; sand share 1.5 of 5.5 parts.

StepWorkingResult
Wet volumeGiven1 m³
Dry volume1 × 1.541.54 m³
Sand share (M20 1:1.5:3)1.5 of 5.5 parts1.5 ÷ 5.5
Sand, before wastage1.54 × 1.5 ÷ 5.50.42 m³ · 14.83 cft · 0.148 brass · 672 kg
Sand, with 5% wastage0.42 × 1.050.441 m³ · 15.57 cft · 0.156 brass · 706 kg (0.706 t)

Before wastage the sample is 0.42 m³ (14.83 cft, 0.148 brass, 672 kg) — the PropertiesOnline and SiteSetu anchor, reproduced exactly.

Try a preset

Twelve worked jobs, from 1 m³ of M20 concrete to 500 sq ft of plaster — tap one to load its figures into the calculator above.

How to use this sand calculator

  1. Pick the work type and the grade or ratio. Concrete, brick mortar or plaster — then the grade (M10, M15, M20 or M25) or the cement:sand ratio (1:3, 1:4, 1:5 or 1:6). The grade or ratio decides the sand share, and the work type decides the dry factor.
  2. Give the quantity. A wet volume in m³, length × width × thickness in metres or feet, or — for plaster — an area in sq ft and a thickness in mm (6, 12, 15 or 20 mm). The calculator converts feet and sq ft to cubic metres first.
  3. Pick the sand type and the wastage. River sand, M-sand or P-sand — the density decides the weight — and a wastage percentage (5% is the default; plaster on uneven walls can need up to 20%). Enter your supplier's rate per cft or per brass for a cost.
  4. Read the sand in m³, cft, brass and tonnes. The with-wastage figure is the order quantity; the before-wastage figure sits beside it so you can check the working. Order on the with-wastage figure and check the delivered quantity against the supplier's slip.

The rules behind the answer

Seven rules, each one checkable against the sources. Nothing here is a guess — and where a source states a figure differently, the page says so.

RuleDetail
Dry volume: × 1.54 concrete, × 1.33 mortar and plaster Wet concrete, mortar and plaster contain voids, so the dry materials take more volume than the wet job: 1 m³ wet needs 1.54 m³ dry for concrete and 1.33 m³ dry for mortar and plaster (PropertiesOnline; SiteSetu's M20 worked example uses the same 1.54). The factor multiplies the wet volume first — before any ratio is applied.
Sand is the sand share of the mix ratio The sand is the sand share of the dry volume: M20 is 1:1.5:3, so the sand is 1.5 of 5.5 parts — 1.54 × 1.5 ÷ 5.5 = 0.42 m³ per cubic metre wet (PropertiesOnline states the formula as wet volume × dry factor × sand share; SiteSetu's per-grade table agrees at every grade). Mortar and plaster ratios work the same way: 1:4 means 4 of 5 parts sand.
1 brass = 100 cft = 2.8317 m³ One brass is exactly 100 cubic feet, or 2.8317 m³ (Toolique; SiteSetu agrees). So brass is cft ÷ 100 and cft is m³ × 35.3147. At the densities on this page, one brass weighs about 4.53 tonnes of river sand, 4.95 tonnes of M-sand (4.955 t unrounded) and 4.67 tonnes of P-sand.
Densities: river 1,600, M-sand 1,750, P-sand 1,650 kg/m³ Weight is volume × density, using bulk densities for dry, clean sand: river sand 1,600 kg/m³, M-sand 1,750 kg/m³ and P-sand 1,650 kg/m³ (Toolique, IS 383:2016 grading zones; PropertiesOnline agrees on river sand). One cubic foot of river sand is about 45 kg. Damp sand is heavier — SiteSetu's IS 875 table gives wet sand at 1,760–2,000 kg/m³.
Wastage 0–20%, default 5% Wastage multiplies the sand: 5% is the usual allowance for concrete and mortar, and plaster on uneven walls can need up to 20% (Toolique's plaster factor combines 1.33 dry volume with a 20% allowance for unevenness, raked joints and scaffolding drops — 1.33 × 1.20 = 1.596 ≈ 1.60). The range on this page is 0–20%, default 5%; the with-wastage figure is the order quantity.
The Toolique plaster difference, stated plainly Toolique's plaster example (100 sq ft, 12 mm, 1:4) states 0.178 m³ (6.29 cft, 0.063 brass, ~293 kg of P-sand). That figure reproduces exactly as wet volume × 1.60 with the 4/5 sand share never applied — the 1:4 ratio is never used for the sand. This page applies the share and gives 0.142 m³, 5.03 cft, 0.050 brass, 235 kg — 25% less. SiteSetu agrees with the share method (0.136 m³ with a 15% allowance). The page states the difference, it does not hide it.
Cost uses your rate, never a fixed price No sand price is fixed anywhere on this page. Enter your supplier's rate per cft and the cost is the with-wastage cft times that rate; enter only a rate per brass and the cost is the with-wastage brass times that rate. Per-cft and per-brass rates are not the same price — ₹60 a cft and ₹5,800 a brass give ₹1,869 and ₹1,807 for the same 2 m³ of M20 — so check which unit your supplier means.

Sand only — the full mix is a different calculation

This tool works out the sand for a job: pick concrete, brick mortar or plaster, give the quantity, and it returns the sand in m³, cft, brass and tonnes, with a cost when you enter a rate. The answer is one material.

A concrete or mortar mix has three materials, not one. For 1 m³ of M20 concrete the full breakdown is 8.06 bags of cement, 0.42 m³ of sand and 0.84 m³ of aggregate (SiteSetu) — this page gives you the 0.42 m³ of sand and leaves the cement and aggregate to the Cement Calculator, which computes the whole mix. That tool is queued and will be linked here once it is live; until then it is named in plain words, not linked.

So the two tools answer different questions. If you need to order sand — how many cft, how many brass, how many tonnes — start here. If you need the whole bill of materials for a slab or a wall, the Cement Calculator is the tool for that.

Eleven jobs, eleven answers

Eleven worked examples — each one reproduced by this calculator, except where a difference is stated.

1 m³ of M20 concrete needs 0.42 m³ of sand

One cubic metre of M20 concrete (1:1.5:3) needs 0.42 m³ of river sand before wastage — 14.83 cft, 0.148 brass, 672 kg. With the usual 5% wastage it is 0.441 m³, 15.57 cft, 0.156 brass, 706 kg. That is the PropertiesOnline and SiteSetu anchor, reproduced exactly.

0.441 m³ (15.57 cft, 0.156 brass) of river sand — 706 kg (0.706 tonnes).

10 m³ of M15 concrete: 4.62 m³ of M-sand

Ten cubic metres of M15 concrete (1:2:4) needs 4.4 m³ of M-sand before wastage and 4.62 m³ with 5% wastage — 163.15 cft, 1.632 brass, 8,085 kg (8.085 tonnes). At ₹55 a cft the sand costs about ₹8,973.

4.62 m³ (163.15 cft, 1.632 brass) of m-sand — 8085 kg (8.085 tonnes), about ₹8,973.

5 m³ of M10 concrete: 2.541 m³ of river sand

Five cubic metres of M10 concrete (1:3:6) at 10% wastage needs 2.541 m³ of river sand — 89.73 cft, 0.897 brass, 4,066 kg (4.066 tonnes). Before wastage it is 2.31 m³, 81.58 cft, 0.816 brass, 3,696 kg.

2.541 m³ (89.73 cft, 0.897 brass) of river sand — 4066 kg (4.066 tonnes).

3 m³ of 1:6 brick mortar: 3.591 m³ of sand

Mortar is mostly sand: 3 m³ of 1:6 brick mortar needs 3.42 m³ of river sand before wastage and 3.591 m³ with 5% wastage — 126.82 cft, 1.268 brass, 5,746 kg (5.746 tonnes). The dry factor for mortar is 1.33, not 1.54.

3.591 m³ (126.82 cft, 1.268 brass) of river sand — 5746 kg (5.746 tonnes).

100 sq ft of 12 mm plaster: 0.142 m³, not 0.178

Toolique's worked example says 100 sq ft of 12 mm plaster in a 1:4 mix needs 0.178 m³ of sand — but that is the whole dry volume, with the 4/5 sand share never applied. The share method gives 0.142 m³, 5.03 cft, 0.050 brass, 235 kg of P-sand (with the 20% joints allowance the example itself carries). That is 25% less sand — about a quarter of a brass less per 100 sq ft. SiteSetu agrees with the share method (0.136 m³ with a 15% allowance).

0.142 m³ (5.03 cft, 0.05 brass) of p-sand — 235 kg (0.235 tonnes).

How many brass? 10 m³ of M15 is 1.632 brass

Sand is ordered by the brass in much of India, and one brass is 100 cft (2.8317 m³). Ten cubic metres of M15 concrete needs 4.62 m³ of M-sand with wastage — 163.15 cft, or 1.632 brass. Order 2 brass and you have a little in hand; order 1 brass and you are short by 63 cft.

4.62 m³ (163.15 cft, 1.632 brass) of m-sand — 8085 kg (8.085 tonnes), about ₹8,973.

Weigh it: 5 m³ of M10 is 4.066 tonnes

Suppliers who sell by weight quote tonnes. Five cubic metres of M10 concrete needs 2.541 m³ of river sand with 10% wastage — at 1,600 kg/m³ that is 4,066 kg, or 4.066 tonnes. The same volume of M-sand would weigh more (1,750 kg/m³); P-sand sits between the two at 1,650 kg/m³.

2.541 m³ (89.73 cft, 0.897 brass) of river sand — 4066 kg (4.066 tonnes).

What it costs: ₹1,869 at ₹60 a cft

Two cubic metres of M20 concrete needs 0.882 m³ of river sand with 5% wastage — 31.15 cft. At ₹60 a cft that is about ₹1,869. Quoted per brass instead, ₹5,800 a brass gives about ₹1,807 for the same 0.311 brass — the two rates are not the same price, so check which unit your supplier means. No price is fixed on this page: the cost always uses the rate you enter.

0.882 m³ (31.15 cft, 0.311 brass) of river sand — 1411 kg (1.411 tonnes), about ₹1,869.

Wastage changes the order: 0% vs 15%

On the same 1 m³ of M20 concrete, 0% wastage means 0.42 m³, 14.83 cft, 0.148 brass, 672 kg of river sand. At 15% wastage it is 0.483 m³, 17.06 cft, 0.171 brass, 773 kg — 0.063 m³ more sand for the same job. The 5% default sits between the two at 0.441 m³, 15.57 cft, 0.156 brass, 706 kg. Plaster on uneven walls can need up to 20%.

0.441 m³ (15.57 cft, 0.156 brass) of river sand — 706 kg (0.706 tonnes).

Measured in feet: 20 × 15 × 0.5 ft is 4.248 m³ wet

A slab measured in feet still converts the same way: 20 ft × 15 ft × 0.5 ft is 150 cft, which is 4.248 m³ wet. As M15 concrete (1:2:4) that needs 1.869 m³ of M-sand before wastage and 1.962 m³ with 5% wastage — 69.3 cft, 0.693 brass, 3,434 kg (3.434 tonnes).

1.962 m³ (69.3 cft, 0.693 brass) of m-sand — 3434 kg (3.434 tonnes).

Same sand, three weights: river 706 kg, M-sand 772 kg, P-sand 728 kg

The volume does not change with the sand type — 1 m³ of M20 concrete always needs 0.441 m³ with 5% wastage — but the weight does. River sand (1,600 kg/m³) weighs 706 kg, M-sand (1,750 kg/m³) weighs 772 kg, and P-sand (1,650 kg/m³) weighs 728 kg. That is why a supplier selling by the tonne and a supplier selling by the brass can quote different-looking prices for the same job.

0.441 m³ (15.57 cft, 0.156 brass) of river sand — 706 kg (0.706 tonnes).

Every figure on the sample, and how it is worked out

Each figure on the sample — 1 m³ of M20 concrete (1:1.5:3), river sand, 5% wastage — with the rule behind it. The figure that surprises people is the dry factor: 1 m³ wet becomes 1.54 m³ dry, and only the sand share of that is sand.

FigureHow it is worked outTypicalOn the sample
Wet volume The volume you give Measured, or from length × width × thickness 1 m³
Dry factor Wet × 1.54 for concrete, × 1.33 for mortar/plaster Voids in the dry materials 1.54
Dry volume Wet volume × dry factor 1 × 1.54 1.54 m³
Sand share (M20) Sand parts ÷ total parts 1:1.5:3 → 1.5 ÷ 5.5 1.5 of 5.5 parts
Sand, before wastage Dry volume × sand share 1.54 × 1.5 ÷ 5.5 0.42 m³ · 14.83 cft · 0.148 brass
Wastage Sand × (1 + wastage ÷ 100) 5% usual; up to 20% for plaster 5% → × 1.05
Sand, with wastage The order quantity 0.42 × 1.05 0.441 m³ · 15.57 cft · 0.156 brass
Weight Sand m³ × density River 1,600 · M-sand 1,750 · P-sand 1,650 706 kg (0.706 t) at 1,600 kg/m³
Brass Cft ÷ 100 (1 brass = 100 cft) 1 brass = 2.8317 m³ 0.156 brass
Cost Cft × ₹/cft (or brass × ₹/brass) Your supplier's rate, never a fixed price No rate entered

Sand per cubic metre, by grade and ratio

PropertiesOnline's, Toolique's and SiteSetu's published figures, fetched 15 November 2026, plus the exact arithmetic shown in the table. Sand per cubic metre is before wastage; add the wastage percentage for the order quantity.

FigureNoteSourceTypical
M10 concrete (1:3:6) Sand per 1 m³ wet — dry 1.54 × 3/10 SiteSetu per-m³ table 0.462 m³ · 16.32 cft
M15 concrete (1:2:4) Sand per 1 m³ wet — dry 1.54 × 2/7 SiteSetu per-m³ table 0.44 m³ · 15.54 cft
M20 concrete (1:1.5:3) Sand per 1 m³ wet — dry 1.54 × 1.5/5.5 PropertiesOnline + SiteSetu 0.42 m³ · 14.83 cft
M25 concrete (1:1:2) Sand per 1 m³ wet — dry 1.54 × 1/4 (nominal) SiteSetu grade list 0.385 m³ · 13.6 cft
Brick mortar 1:3 Sand per 1 m³ wet — dry 1.33 × 3/4 This tool (dry 1.33) 0.998 m³ · 35.23 cft
Brick mortar 1:4 Sand per 1 m³ wet — dry 1.33 × 4/5 This tool (dry 1.33) 1.064 m³ · 37.57 cft
Brick mortar 1:5 Sand per 1 m³ wet — dry 1.33 × 5/6 This tool (dry 1.33) 1.108 m³ · 39.14 cft
Brick mortar 1:6 Sand per 1 m³ wet — dry 1.33 × 6/7 SiteSetu brickwork rows 1.14 m³ · 40.26 cft
1 brass of sand 100 cft = 2.8317 m³ Toolique + SiteSetu River ≈ 4.53 t · M-sand ≈ 4.95 t · P-sand ≈ 4.67 t
1 cft of river sand 0.0283168 m³ × 1,600 kg/m³ PropertiesOnline ≈ 45 kg
River sand density Bulk density, dry and clean PropertiesOnline + Toolique (IS 383) 1,600 kg/m³
M-sand / P-sand density Bulk density, dry and clean Toolique (IS 383:2016 zones) 1,750 / 1,650 kg/m³

Common sand calculation mistakes to avoid

DRY FACTOR
Using the wet volume as the sand — 1 m³ wet is 1.54 m³ dry for concrete and 1.33 m³ dry for mortar and plaster. The sand is the sand share of that dry volume — 0.42 m³ for 1 m³ of M20 — not 1 m³. Skipping the dry factor understates the order by more than half.
SHARE
Taking the whole dry volume as sand — Toolique's plaster example does exactly this: 0.111 m³ wet × 1.60 = 0.178 m³ reported as sand, with the 1:4 ratio never applied. The sand is 4/5 of the dry mortar — 0.142 m³ — and the rest is cement. Forgetting the share overstates the sand by 25%.
GRADE
Using the wrong grade or ratio — M10, M15, M20 and M25 need different amounts of sand per cubic metre: 0.462, 0.44, 0.42 and 0.385 m³. Mortar ratios differ more — 1:6 needs 1.14 m³ per cubic metre of wet mortar, 1:3 needs 0.998 m³. Pick the grade or ratio on the drawing, not the one you remember.
TYPE
Pricing by weight with the wrong density — The volume is the same for every sand type, but the weight is not: 0.441 m³ is 706 kg as river sand, 772 kg as M-sand and 728 kg as P-sand. Ordering by the tonne with the wrong density means ordering the wrong volume.
WASTAGE
Ordering with no wastage at all — Spillage, uneven walls, raked joints and scaffolding drops all eat sand. The default 5% covers ordinary concrete and mortar; plaster on uneven walls can need up to 20%. On 1 m³ of M20, 0% wastage is 0.42 m³ and 15% is 0.483 m³ — the difference is a barrow-load.
BRASS
Ordering brass without checking the cft — One brass is 100 cft, but a job rarely lands on a whole number of brass: 10 m³ of M15 needs 1.632 brass. Ordering 1 brass leaves you 63 cft short; ordering 2 leaves a little in hand. Check the cft figure before rounding to whole brass.
PRICE
Trusting a fixed sand price — Sand rates vary by city, season and distance from the quarry, and per-cft and per-brass rates are not the same price: ₹60 a cft and ₹5,800 a brass give ₹1,869 and ₹1,807 for the same 2 m³ of M20. This page never fixes a price — always cost it on your supplier's current rate.

Before you order the sand

  • Is the work type right — concrete on the sample — with the grade M20 (1:1.5:3), not M15 or M25?
  • Is the quantity right — 1 m³ wet on the sample — and, if you measured in feet, did length, width and thickness all use feet?
  • Is the sand type the one you are ordering — river sand on the sample — so the weight (706 kg) matches the supplier's slip?
  • Is the wastage right — 5% on the sample — and did you raise it towards 20% for plaster on uneven walls?
  • Does the answer read right — 0.441 m³, 15.57 cft, 0.156 brass, 706 kg on the sample — with the before-wastage figures beside it?
  • Did you check the brass figure — 0.156 brass on the sample — against the cft, since sand is often ordered by the brass?
  • If you entered a rate, is it your supplier's rate — and did you check whether it is per cft or per brass, since the two give different costs?
  • Did you check the dry factor — 1.54 for concrete, 1.33 for mortar and plaster — and not use the wet volume as the sand?
  • Did you remember this is sand only — the Cement Calculator, not this page, gives the cement and aggregate for the mix?
  • Did you treat the answer as an estimate for ordering — densities are averages, damp sand is heavier — and check the delivered quantity against the supplier's slip?

Sand calculator FAQs

How much sand do I need for 1 m³ of M20 concrete?
0.42 m³ of sand before wastage — 14.83 cft, 0.148 brass, 672 kg of river sand. With the usual 5% wastage it is 0.441 m³, 15.57 cft, 0.156 brass, 706 kg. The working is 1 × 1.54 = 1.54 m³ dry, and the sand share of M20 (1:1.5:3) is 1.5 of 5.5 parts, so 1.54 × 1.5 ÷ 5.5 = 0.42 m³. That is the PropertiesOnline and SiteSetu anchor, reproduced exactly.
How many cft are in 1 brass of sand?
100 cft — exactly 2.8317 m³. At the densities on this page, one brass of river sand weighs about 4.53 tonnes, one brass of M-sand about 4.95 tonnes (4.955 t unrounded) and one brass of P-sand about 4.67 tonnes. A standard tractor trolley carries 1 brass; a 6-wheeler tipper carries 2.5 to 3 brass.
How much sand is needed for 100 sq ft of 12 mm plaster?
0.142 m³, 5.03 cft, 0.050 brass, 235 kg of P-sand — for a 1:4 mix with the 20% joints allowance the example itself carries. Toolique's worked example for the same job says 0.178 m³ (6.29 cft, 0.063 brass, ~293 kg), but that figure is the whole dry volume with the 4/5 sand share never applied: wet 0.111 m³ × 1.60 = 0.178 m³. The share method (dry 1.33 × 1.20 = 1.596, then × 4/5) gives 0.142 m³, which is 25% less. SiteSetu agrees with the share method: 0.136 m³ with a 15% allowance. This page uses the share method.
What is the 1.54 dry volume factor?
Dry materials have voids between the particles, so a cubic metre of wet concrete needs more than a cubic metre of dry material: 1.54 times as much for concrete, 1.33 times for mortar and plaster. The factor multiplies the wet volume first; the sand is then the sand share of that dry volume. Using the wet volume directly as the sand understates the order by a third or more.
Which sand should I use — river sand, M-sand or P-sand?
River sand (1,600 kg/m³) is the general-purpose sand for concrete and mortar. M-sand (1,750 kg/m³), manufactured crushed stone sand, is used for concrete and brickwork where river sand is scarce or banned. P-sand (1,650 kg/m³) is the fine plastering sand — graded to IS 383 Zone IV, with over 90% passing the 600-micron sieve — and is the right choice for plaster. The volume does not change with the type, but the weight does: the same 0.441 m³ weighs 706 kg as river sand, 772 kg as M-sand and 728 kg as P-sand.
How is the cost worked out?
From the rate you enter — never from a fixed price on this page. Enter a rate per cft and the cost is the with-wastage cft times that rate; enter only a rate per brass and the cost is the with-wastage brass times that rate. On the worked example, 2 m³ of M20 concrete needs 31.15 cft with wastage, so ₹60 a cft gives about ₹1,869, while ₹5,800 a brass gives about ₹1,807 for the same 0.311 brass — check which unit your supplier means.
How much wastage should I allow?
5% is the usual allowance for concrete and mortar, and it is this page's default. Plaster on uneven walls, with raked joints and scaffolding drops, can need up to 20% — the plaster example on this page uses 20% for that reason. The range on this page is 0–20%; 0% is only right if you are measuring a quantity already allowed for, and 15% is the allowance SiteSetu uses in its plaster tables.
Can I give the size in feet instead of metres?
Yes — pick feet and give length, width and thickness all in feet. The calculator converts the cubic feet to cubic metres (÷ 35.3147) before anything else. A slab of 20 ft × 15 ft × 0.5 ft is 150 cft, which is 4.248 m³ wet; as M15 concrete that needs 1.962 m³ of M-sand with 5% wastage (69.3 cft, 0.693 brass, 3,434 kg).
Is this the same as the Cement Calculator?
No. This tool works out the sand only — in m³, cft, brass and tonnes, with a cost when you enter a rate. The Cement Calculator (entry 361, queued) works out the full mix: cement, sand and aggregate together. For 1 m³ of M20 the full breakdown is 8.06 bags of cement, 0.42 m³ of sand and 0.84 m³ of aggregate — this page gives you the 0.42 m³ of sand. The Cement Calculator will be linked here once it is live; until then it is named in plain words, not linked.
Is the answer a quote I can order against?
No — it is an estimate for ordering. Densities are bulk averages for dry, clean sand, and damp sand is heavier, so weigh the delivered load against the supplier's slip. Bulking — the volume increase of damp fine sand, 15–30% at 4–6% moisture — is not modelled here. Rates vary by city, season and distance from the quarry, which is why this page never fixes a price. Order on the with-wastage figure and check the first load.

Methodology and honest limits

The figures on this page were checked against the three sand calculators India actually uses, on 15 November 2026. All three were read in full (raw copies in sources/). The competitor pages: PropertiesOnline's sand calculator (1 m³ of M20 needs "about 0.42 m³ (~15 cft, ~0.67 tonnes), before wastage"; the formula is stated as wet volume × dry factor × sand share; 1 cft of river sand is about 45 kg at 1,600 kg/m³; dry factor 1.54 for concrete, 1.33 for mortar and plaster); Toolique's sand calculator (1 brass is exactly 100 cft, 2.8317 m³; river sand 1,600 kg/m³ — one brass about 4.53 tonnes — M-sand 1,750 kg/m³ — about 4.95 tonnes — and P-sand 1,650 kg/m³, IS 383:2016 grading zones; bulking 15–30% at 4–6% moisture per IS 2386 Part 3; tractor trolley 1 brass, 6-wheeler tipper 2.5–3 brass, 10/12-wheeler dumper 5–6 brass); and SiteSetu's sand calculator and calculators hub (M20 1 m³ = 8.06 bags cement + 0.42 m³ sand + 0.84 m³ aggregate; per-m³ sand table M10 0.462, M15 0.440, M20 0.420; plaster per 100 sq ft 12 mm 1:4 = 0.136 m³ with a 15% allowance; brickwork per 1 m³ 1:6 = 0.256 m³ sand; a 6 m × 4.5 m M20 slab 150 mm thick needs 1.701 m³ of sand; densities from IS 875 Part 1:1987 Table 1 — dry sand 1,540–1,600 kg/m³, wet sand 1,760–2,000 kg/m³). Two more material calculators were read for demand and cross-checks: BuildEstimate AI's material quantity calculator ("for M20 grade (1:1.5:3 ratio), you first calculate the dry volume (wet volume × 1.54)"; 1 m³ of M20 needs about 8 bags cement, 15 cft sand, 30 cft aggregate) and Apna Basera's material calculator (sand about 1.6 cft per sq ft of built-up area; 1,500 sq ft needs about 2,400 cft of sand; one brass is 100 cft). Where the sources disagree, the page states it. The one disagreement that matters is Toolique's plaster example: 100 sq ft of 12 mm plaster in a 1:4 mix is stated as 0.178 m³ (6.29 cft, 0.063 brass, ~293 kg of P-sand), which reproduces exactly as wet volume × 1.60 with the 4/5 sand share never applied — the 1:4 ratio is never used for the sand. This page applies the share (dry 1.33 × 1.20 = 1.596 ≈ 1.60, then × 4/5) and gives 0.142 m³, 5.03 cft, 0.050 brass, 235 kg — 25% less — and says so on the page, with SiteSetu's 0.136 m³ as the independent cross-check. The densities used are the planning densities PropertiesOnline and Toolique agree on (river 1,600, M-sand 1,750, P-sand 1,650 kg/m³); SiteSetu's IS 875 table also quotes river sand at 1,840 kg/m³, which was not adopted — it conflicts with the 1,540–1,600 kg/m³ the same table gives for dry sand and with both other sources. Nominal mixes per IS 456 Table 9 are allowed only up to M20; M25 and above need a design mix (IS 10262), so the 1:1:2 figure for M25 is an indicative nominal equivalent. This tool is distinct from the Cement Calculator (entry 361, queued): that tool computes the full mix, while this tool computes the sand only — the Cement Calculator is named in plain words on this page and will be linked once it is live. For related tools, the EMI Calculator works out any loan's monthly payment, the SIP Calculator covers savings growth, the PPF Calculator covers the Public Provident Fund, the FD Calculator covers fixed deposits, the Income Tax Calculator works out tax under both regimes, the Percentage Calculator and GST Calculator cover everyday percentages and tax, the CGPA Calculator converts CGPA to percentage, the BMI Calculator works out body mass index, and the HRA Calculator works out the house rent allowance exemption. Last updated 15 November 2026.

The arithmetic on this page is exact: dry volume is wet volume × 1.54 for concrete and × 1.33 for mortar and plaster; sand is dry volume × sand parts ÷ total parts (M10 1:3:6, M15 1:2:4, M20 1:1.5:3, M25 1:1:2; mortar and plaster 1:3, 1:4, 1:5, 1:6); sand in cft is m³ × 35.3147; one brass is 100 cft (2.8317 m³); weight is m³ × density (river sand 1,600, M-sand 1,750, P-sand 1,650 kg/m³); wastage multiplies the sand by (1 + wastage ÷ 100), default 5%, range 0–20%; cost is cft × ₹/cft when a cft rate is entered, otherwise brass × ₹/brass. Rounding is round-half-up (1e-9 nudge): sand m³ to 3 decimals, cft to 2, brass to 3, kg to whole kg, tonnes to 3, cost to whole rupees; derived quantities are computed from the unrounded sand m³, then rounded. Two brief figures were corrected by exact arithmetic and are documented in sources.md: the sample's with-wastage cft is 15.57, not 15.58 (0.441 × 35.3147 = 15.5738), and the plaster example's with-wastage cft is 5.03 and its weight 235 kg, not 5.02 and 234 kg (unrounded sand 0.14234 m³). Validation: work type concrete, brick mortar or plaster; grade M10/M15/M20/M25 for concrete or ratio 1:3/1:4/1:5/1:6 for mortar and plaster; quantity by wet volume (0.01–10,000 m³), dimensions (length and width 0.01–1,000, thickness 0.01–10 m or 0.01–30 ft) or plaster area (1–100,000 sq ft) and thickness (6/12/15/20 mm); sand type river, M-sand or P-sand; wastage 0–20%; rates 0–100,000 (0 means not entered). Invalid inputs return null, never a result.

Honest limits: this is an estimate for ordering, not a quote. Densities are bulk averages for dry, clean sand — damp sand is heavier (SiteSetu's IS 875 table gives wet sand at 1,760–2,000 kg/m³ against 1,540–1,600 dry), so weigh the delivered load against the supplier's slip rather than this page. Bulking of sand — the volume increase of damp fine sand, 15–30% at 4–6% moisture per IS 2386 (Part 3) — is not modelled here; if your sand is visibly damp, order on the dry-volume figure and check the first load. No sand price is fixed anywhere on this page: the cost uses the rate you enter, and rates vary by city, season and distance from the quarry. Nominal mixes per IS 456 Table 9 are allowed only up to M20; M25 and above need a design mix (IS 10262), so the 1:1:2 figure for M25 is an indicative nominal equivalent. Nothing you type is uploaded or stored: the calculation runs in your browser.

Plan around the answer — the cost and the rest

Try different figures or a different sand type — or run the same check with the related tools for your other plans.